To not lose the whole day I started on Section 21 and prepared some parts that will be riveted to the center section soon and therefore also need priming, the floor boards and the aft ribs as well as some small parts. I deburred them and also did some dimpling one the floor boards and the ribs that share the nutplate line.
The Stewart Systems primer is supposed to arrive tomorrow, so I see that I get the parts prepped for priming before the UPS guy comes along. That'll be tough as we are having a cold front moving through and it'll be stormy, rainy and around freezing, so playing with water and working outside is not real fun anymore...
Unfortunately, the replacement skin for the flaperon won't make it here before Monday, so it'll take a while before I can revisit this screw-up and try to determine what went wrong.
No comments:
Post a Comment