I got a bit sloppy with updating the blog but I did get some work done, despite not telling you until now.
I have to admit though that working outside with the high humidity and the usual high temperatures over 100F does make it very hard to maintain a good pace. A few hours feel like I spent all day outside.
So on Friday night, I took off the vertical stabilizer and rudder assembly to get better access to the rivet holes in the tail skins.
In order to secure the rudder cables I connected them with a piece of safety wire.
Now I could get at that rivet holes and I started riveting the nutplates onto the tail skins, to which the fairing halves will eventually connect to.
I used the manual squeezer for this delicate job as I wasn't sure if I could get a good flat seating done with the heavy pneumatic squeezer. The heavy weight reduces the tactile feedback and just provides no feel as to how flat the die sits before squeezing. The manual is much better at that.
The first run was quickly done.
And the second one was even quicker done.
Without the rudder assembly the plane looks like nothing that could fly soon. That's a bit disheartening but fortunately I know better.
That ended Friday night.
On Saturday morning, I decided to continue Section 40, the lighting installation. One of the open tasks was to install the HAL9000 simulation in the cockpit. For the not so cineastic ones among my readers, this describes a red-light camera eye. Well, Van's didn't provide a camera feature but it definitely qualifies as a red-light eye.
I almost didn't want to install it as the light it creates is so faint that you could hardly find your panel if you wouldn't know it's there in the dark. To stay more ELSA compliant, I decided to install it for now before considering getting something that could actually help to read a map if needed.
So I ran the wire pair through the rollbar. I actually ran a thin wire, starting on the top running it down, and then connected the pair to the guide wire with duct tape (cutting off the excess as the hole is pretty small). Then I pulled the pair with the guide wire through the rollbar and through the hole on the top. The bushing was pulled out but as it is a snap bushing it snapped right back in.
Had I read the instructions better I wouldn't have had to this task 3 times before being satisfied.
The part I missed was that they wanted me to not just run the wire pair though but also a 1/4 OD plastic tube to protect the wires from chafing. The other time I had to redo it was owed to me not caring about the routing of the wires below the rollbar plane. It is actually much more reasonable to route the wires BEHIND the ELT frame instead of in front of it.
Once I did it all correct, the back of the rollbar structure looked like this.
Finally I could install the actual light feature.
The riveting was quickly done and I also added some RTV on the back of it to hold the splice connectors in place. The clamp is actually doing this in the picture while the RTV is curing.
That concluded the activities on Saturday and today I was focusing on the electrical wing connectors, aka Section 31A.
I had never installed the flimsy connectors that Van's had come up with initially. I assembled them but decided that I would use trailer light connectors in lieu of a better connectivity solution.
Well, Van's came up with something better than that and after a lot of studying I decided to do the change to the new connectors. For now, I decided not to do a big wire retrofit of the wings, so I won't install separate wires for running the Nav lights without the strobes and I will also not install the sync wire to keep the strobes synchronized over a long period of time.
This is all extra weight and a lot of work at this stage but I do not see the necessity or even a real benefit. I might change my mind later when flying but I seriously doubt it.
I started by removing the old connector plates and marking which part of the connector has what reference number. Trust me, this gets confusing quickly as Van's did not do the installation as you might expect.
Then I installed the capacitor on the left side wiring. This ensures that you're not cutting off a spade connector that you actually needed. The plans do not do this in this order.
Then I cut off the spade connectors from the Stall Warning and the Ground wires and crimped on the new connectors onto the Ground, Stall Warning and the new Nav light wires.
Onto the right side. This was easier as there were no spade connectors that were still needed, so all the old connectors were replaced by new ones.
Then I inserted the connectors into the new plug for the right side.Watch out!
The plugs are different on each side. The right side wants the plug that has the thick plastic pins sticking out, whence it's called a male connector.
The same happened on the left side, only the plug is a female one which has the metal bushings that allow it to float.
Time for drilling the seat pan in the cockpit. Again, Van's provided a template that uses existing rivet heads to position it.
The HF angle drill is just a bit too deep for one of the 4 holes. I drilled 3 holes and clecoed in between. For the 4th hole I used my close quarter angle drill and I opened up all the holes to #19 with that drill as well.
I vacuumed the interior of the gills to remove the debris from the drilling (and a lot of dust from just sitting around) and then went on to prep the angles that would hold the connectors in place.
The top 4 holes that connect the angle to the seat pan needed tapping in 8-32.
The wires on the left side needed to get tamed with some cable ties and then the angle went on.
When installing those angles be careful again. Look at the connectors, they can be rotated and present a different connection pattern if you do. Each connector has a female and a male section on its face. The male section should always be below the female section. Here are the pictures, left side:
... and the right side:
The next steps will be to close up the openings on each side and to install a snap bushing on the left side where I will run the AOA tube through. Then I will work on the wing connectors.
Showing posts with label Section 12. Show all posts
Showing posts with label Section 12. Show all posts
Sunday, July 1, 2012
Thursday, June 28, 2012
Fairing Work
Today I received my long #40 drill bit and put it to work. I drilled the nutplate attach rivet holes by using a #6 screw to hold the nutplates in position while drilling through the flange holes into the tailcone skin, clecoing as I progressed.
The only problem came up when I tried to dimple the upper inboard holes that are located right next to the vertical stabilizer. With the rudder horn in place, there's no room for the yoke of the squeezer to get to the skin.
I used my dimple dies for the pull riveter to get the dimples in the skin.
This problem will be more severe when the job is to rivet them in place but I had planned to take the rudder assembly off any time soon anyway. That should solve the problem then.
Done with the dimpling. One cleco each holds the nutplates in place until I can rivet them to the skins.
I expect to take the rudder assembly off tomorrow and to rivet the nutplates on in one session.
Van's cashed the check for the engine and I heard rumor that the crating department might get my engine into shipping on Friday.
The only problem came up when I tried to dimple the upper inboard holes that are located right next to the vertical stabilizer. With the rudder horn in place, there's no room for the yoke of the squeezer to get to the skin.
I used my dimple dies for the pull riveter to get the dimples in the skin.
This problem will be more severe when the job is to rivet them in place but I had planned to take the rudder assembly off any time soon anyway. That should solve the problem then.
Done with the dimpling. One cleco each holds the nutplates in place until I can rivet them to the skins.
I expect to take the rudder assembly off tomorrow and to rivet the nutplates on in one session.
Van's cashed the check for the engine and I heard rumor that the crating department might get my engine into shipping on Friday.
Sunday, June 24, 2012
Attaching Fairing to Tail Cone
In the morning I started the task I had dreaded yesterday. Installing the stabilator yet again. I got lucky, I have to say, as the washers stayed in place this time. And I didn't have to install the counterweight nor did I have to tighten the bolts of the stabilator.

To install the fairing one has to disassemble it again. So off came the screws.

In order to hold the fairing in position you could use tape but then how would you see where you have to drill later? I chose to give it some support from below.

I slid the upper half over and attached it with the screws again.

A little bit of easy to remove blue tape held positioned the fairing assembly but how in the world was I supposed to see where to drill??? The markings didn't show through the fiberglass at all.

What I could see was part of the line outside of the fiberglass and I could see the edge of the sheet metal through the fiberglass. That was enough reconstruct the drill markings on the outside of the fairing.

It sure was a bit more effort on the lower half but mostly because it was an awkward angle to work at.

The upper holes in the lower half needed some help as the spar was resting on the lower half. I could mark the interference and remove it but only by removing the fairing and reinstalling it afterwards. I didn't want to do this if there was another way - and there was. I could tip the stabilator with one hand and remove the pressure on the fairing, allowing me to drill the upper holes without any distortions in the fiberglass. A little support structure took care of that, so I had both hands for drilling. Everything worked out fine.

I match-drilled the holes with a #27 bit and removed the stabilator and the fairing halves. When I removed the tapes I could see that I really wasn't that much off when recreating the drill pattern.

I cleaned and deburred the holes and then removed the material that still had interference with the spar or the skins. I also drilled the hole in the belly of the fairing to allow for the trim motor arm to penetrate it.

I would have continued to install the nutplates at this point if I had had an extended #40 drill bit. This is required in this step and I honestly don't see a away how to do this without one. Unfortunately, this was not part of the Avery tool kit and I had to order one.
I assume section 12 will just have to wait until the bit gets here some time next week.
In the meanwhile I might pick up on the installation of the electrical wing connectors. There's not much else to do while waiting for the engine. I might also trim the cowling if I need to burn some more time.
To install the fairing one has to disassemble it again. So off came the screws.
In order to hold the fairing in position you could use tape but then how would you see where you have to drill later? I chose to give it some support from below.
I slid the upper half over and attached it with the screws again.
A little bit of easy to remove blue tape held positioned the fairing assembly but how in the world was I supposed to see where to drill??? The markings didn't show through the fiberglass at all.
What I could see was part of the line outside of the fiberglass and I could see the edge of the sheet metal through the fiberglass. That was enough reconstruct the drill markings on the outside of the fairing.
It sure was a bit more effort on the lower half but mostly because it was an awkward angle to work at.
The upper holes in the lower half needed some help as the spar was resting on the lower half. I could mark the interference and remove it but only by removing the fairing and reinstalling it afterwards. I didn't want to do this if there was another way - and there was. I could tip the stabilator with one hand and remove the pressure on the fairing, allowing me to drill the upper holes without any distortions in the fiberglass. A little support structure took care of that, so I had both hands for drilling. Everything worked out fine.
I match-drilled the holes with a #27 bit and removed the stabilator and the fairing halves. When I removed the tapes I could see that I really wasn't that much off when recreating the drill pattern.
I cleaned and deburred the holes and then removed the material that still had interference with the spar or the skins. I also drilled the hole in the belly of the fairing to allow for the trim motor arm to penetrate it.
I would have continued to install the nutplates at this point if I had had an extended #40 drill bit. This is required in this step and I honestly don't see a away how to do this without one. Unfortunately, this was not part of the Avery tool kit and I had to order one.
I assume section 12 will just have to wait until the bit gets here some time next week.
In the meanwhile I might pick up on the installation of the electrical wing connectors. There's not much else to do while waiting for the engine. I might also trim the cowling if I need to burn some more time.
Saturday, June 23, 2012
Tail Fairing Finished
In the morning I turned on the A/C in the shop to cool that space down before working in there for a while.
The task this time was to attach the tabs to the fairing that would connect the upper and lower halves. First the screw holes had to get widened with a #27 drill bit.

I clecoed with #30 clecos as I went on.

Once this was done, the halves and tabs came apart and Van's asked to countersink the nutplate attach holes in those thin tabs. I chose to dimple them instead, along with dimpling the attach holes in the nutplates. Easier, faster (with a pneumatic squeezer) and stronger.

The countersinking that had to be done was for the rivets that would hold the tabs to the fiberglass. I carefully squeezed and followed Van's advice that it was ok to not seat these rivets fully to not crush the fiberglass.

I then connected the halves with the requested screws to reinforce the structure before removing the fiberglass in the slit for the trim arm.

I went outside to open up that slit and to do fine trimming. Everything went well using the usual tools, angle grinder and pneumatic die grinder and some sandpaper on a stirring stick.

At this point I had to mount the stabilator again to do the adjust for clearance before drilling the attach holes into the tailcone skin.
I chose to skip that for today as the sun came around and was shining into that area I would have had to work in for an hour or so. At 110 degrees in the shade, I just said "No" to that.
Maybe tomorrow morning ...
The task this time was to attach the tabs to the fairing that would connect the upper and lower halves. First the screw holes had to get widened with a #27 drill bit.
I clecoed with #30 clecos as I went on.
Once this was done, the halves and tabs came apart and Van's asked to countersink the nutplate attach holes in those thin tabs. I chose to dimple them instead, along with dimpling the attach holes in the nutplates. Easier, faster (with a pneumatic squeezer) and stronger.
The countersinking that had to be done was for the rivets that would hold the tabs to the fiberglass. I carefully squeezed and followed Van's advice that it was ok to not seat these rivets fully to not crush the fiberglass.
I then connected the halves with the requested screws to reinforce the structure before removing the fiberglass in the slit for the trim arm.
I went outside to open up that slit and to do fine trimming. Everything went well using the usual tools, angle grinder and pneumatic die grinder and some sandpaper on a stirring stick.
At this point I had to mount the stabilator again to do the adjust for clearance before drilling the attach holes into the tailcone skin.
I chose to skip that for today as the sun came around and was shining into that area I would have had to work in for an hour or so. At 110 degrees in the shade, I just said "No" to that.
Maybe tomorrow morning ...
Thursday, June 21, 2012
More Fairing Tales
When I came home I started sanding the upper tail fairing a bit more to get a good fit for the next step. This next step was to clamp the tabs onto the lower fairing and to match drill the holes into the fiberglass.


The upper fairing got fitted within the tabs (it's easier to remove the rear ones before inserting the fairing)m got aligned and clamped to the tabs again.
Now the center hole for the screw was drilled into the upper fairing.


Then everything was supposed to get taken apart, so the tabs could get riveted to the inside of the fairing. I chose to leave the tabs attached to the lower fairing so I know which ones went were (some of them got bent to follow the shape better).
The rest of the work can be done in the shop which is very welcome with me. We had around 108 degrees F today and I could really need a break in a cool shop for a change.
Expect more of the same for tomorrow.
The upper fairing got fitted within the tabs (it's easier to remove the rear ones before inserting the fairing)m got aligned and clamped to the tabs again.
Now the center hole for the screw was drilled into the upper fairing.
Then everything was supposed to get taken apart, so the tabs could get riveted to the inside of the fairing. I chose to leave the tabs attached to the lower fairing so I know which ones went were (some of them got bent to follow the shape better).
The rest of the work can be done in the shop which is very welcome with me. We had around 108 degrees F today and I could really need a break in a cool shop for a change.
Expect more of the same for tomorrow.
Wednesday, June 20, 2012
Engine Ordered
There's no stepping back now. Today I've ordered the Powerplant Kit from Van's, accompanied by a check over the full amount. An amount that I rarely ever put on a check before. This really hurts, but I'm sure the first hour flying in this baby will make up for it.
Barb @ Van's said they had 6 engines in stock when I asked last Friday, so I hope to get my kit shipped right away when they cashed the check.
When I got home I got right back to the tail fairings where I left them yesterday. Task for tonight was to tailor some blue tape strips with what will be drill marks to attach the fairings to some nutplates that have yet to be installed.

After the markings were applied to the strips they had to get attached to the tail.

I separated and deburred the reinforcement plates that will hold the nutplates where the two halves will join.

A first trial fit of the lower fairing half showed that it needed a bit more sanding in the front where it touches the tail skin. I just had to get exactly to the scribe line and just remove it. Then it fit pretty well.

The top half was put on and it showed a pretty good first fit.


However, after a while of adjusting I decided that the upper half also needed a bit more sanding on the front to just remove the scribe line. Then it fit a tad better. It was getting dark then and I had to give it up for another day.

I assume I will be tweaking this thing tomorrow and then match drill the fairings into the tail skin.
Barb @ Van's said they had 6 engines in stock when I asked last Friday, so I hope to get my kit shipped right away when they cashed the check.
When I got home I got right back to the tail fairings where I left them yesterday. Task for tonight was to tailor some blue tape strips with what will be drill marks to attach the fairings to some nutplates that have yet to be installed.
After the markings were applied to the strips they had to get attached to the tail.
I separated and deburred the reinforcement plates that will hold the nutplates where the two halves will join.
A first trial fit of the lower fairing half showed that it needed a bit more sanding in the front where it touches the tail skin. I just had to get exactly to the scribe line and just remove it. Then it fit pretty well.
The top half was put on and it showed a pretty good first fit.
However, after a while of adjusting I decided that the upper half also needed a bit more sanding on the front to just remove the scribe line. Then it fit a tad better. It was getting dark then and I had to give it up for another day.
I assume I will be tweaking this thing tomorrow and then match drill the fairings into the tail skin.