Sunday, June 30, 2013

Closing Out Sections

Thanks to the timely arrival of another load of ProSeal, I was able to close out 3 open sections in the build manual that were in some way or another waiting for some sealant job to get done.
Before this weekend work started I was able to remove some more of the Blue Plague that was sticking to the tip of the right wing.


I forgot to take a picture when it was all off but it looks close to what you see above. Quite some scratching again, but nothing deep.

The last days were incredibly hot - even for Tucson. The monsoons are still not anywhere close and so it was a dry heat, and that's the only positive thing to say about it.


This was the sun setting on the last cooler days before the weekend, which is to say it only got to the lower hundreds.


Even the local animals (this one is a particularly young bunny that has not experienced another summer before) were struggling with this heat.
So I decided to get up before 5am each day to be able to get some work done outside without collapsing. Even then it was in the lower 80s.

It was time to mix the smelly ProSeal and get started on sealing the firewall - again. First a look at the beautiful sight of the installed engine.


Then I filled a syringe with ProSeal, in the hopes of making less of a mess, but as you can see, I still am not good at putting the stuff only where it is needed.




It worked much better on the side skins where I sealed the leftover rivet holes from the reinforcement angles. That is because I used blue tape with a slightly oversized hole punched into it as a template. After peeling the tape off I was left with a perfectly round seal.



I also sealed the rivet heads from riveting on the heater box. The manual did not ask for it but I do not understand why as these rivets are providing the same risk of letting gases from the engine seep into the cabin. Angles were too bad to get a shot at them though, so no photos.
This step completed section 54.

After the ProSeal task was done, I put the lower cowl on...


... (pretty, isn't it?)... and installed the SCAT hose, which completed section 49.


I also gooped up the penetration holes in the firewall that contain the cables and wires. I used red RTV for this and not the suggested firewall sealant. I was considering using the rest of the ProSeal but decided against it. If I ever need to pull a wire or want to add another one, removing the RTV would be easier than any of the other sealants. And this completed section 50.



The idea is now to leave the lower cowl on and to remove the instrument cover to finish up the pitot line plumbing. I will try to also install the Ts to plumb in the backup steam gauges at this point and then plug their ends. There is also a tad more wiring work to be done for the avionics which includes running the missing wire from the radio to the AV-50000 for the serial port.
Additional antennas for the PCAS, ADS-D and the APRS system that I will add are sitting in the shop and I think I might add those now as it will be easier to crawl into the tailcone without the tank installed.

Saturday, June 8, 2013

Oil Cooler Fits!

I was so concerned about my modification of the oil cooler position possibly causing problems when attaching it to the cowl and installing the cowl.
Those concerns were not warranted as it turned out that wit a slight modification of the routing of the right oil hose that attaches to the cooler, the system fit perfectly.

It first did not look so good though when I first tried to fit the cowl on. I installed the cooler guides on the bottom cowl as the first step.


In this picture you see the conventional routing of the right oil hose.


With a lot of pulling and cussing the cowl finally slipped into place (or better, yet, was forced to do so). That looked only good from the distance.


On the bottom curves though you could see that the cowl was under a lot of tension and pulled to the left (or pushed, as it later turned out).



So what was causing this? There is so little room in engine area that I could not take a picture of the interfere nor could I myself see it. Bending my arm in ludicrous ways to get my finger tips to follow the oil hoses and feeling for possible contacts, I finally found the reason. The fuel spillover line installed as a patch to the need of Rotax installing a different mechanical fuel pump that vents fuel overboard in case of a malfunction, prevented the oil line from moving up where the oil cooler wanted to go.
This might only be caused by me moving the oil cooler about 1.5" forward as I also had to move it slightly higher than initially planned for. But the clearance would be minimal (if any) in the original position as well.
The reason the oil line is interfering with the aluminum fuel vent line is that the oil line is pointing about  30 degrees toward outboards with the original routing and therefore crossing the vent line. I saw that if I could persuade the line to attach straight from the aft to the cooler, that the line would then clear the vent line and had a chance to bend out of the way further aft.
I tried a few approaches before I finally settled on this one:




The only problem I saw with this routing was that the lower water hose is pushed slightly towards the exhaust and could possibly touch the spring after a while. I planned to apply RTV between the spring and the hose in that area.
There is now only a minimal push to the left as you can see by the oil cooler mounting holes being just slightly out of position.


With this setup the cowling went on almost as easy as before without an oil cooler and there was practically no tension on the cowl.





Before taking the cowl off for the last touches on the lower engine installation, I thought I should take some more shots of this pile of aluminum that now looks almost like a plane...




My wife helped to get some shots of the interior with the cowl still on to give you an idea of how much clearance my modification gave me between oil cooler and muffler.




You'll be the judge as to how vital this modification has been. Without the distance I moved this forward, I could have just squeezed a finger between the cooler and the muffler.

Once the cowl was off again, I finished section 48 (Muffler Installation) by filling the springs with RTV. While at it, I also applied some extra RTV between one of the right springs and the water hose to prevent it from getting contact.



Now this had to cure and so I decided to go back inside and escape the 100 degF it had reached in the carport by then.
I cannot find the description for the next step but I know that the screws holding the bowl to the gascolator have to get safety wired. So I will do that next and then install the bottom cowl and leave it on.
The next section is the installation of the engine controls and after that I could install the tank and fire the thing up.

Monday, June 3, 2013

Exhaust Work

The last weekend was insanely hot here in Tucson. We had around 107F on both days and with the unusually low temps in the lower 90s previously, this was literally a bit overwhelming - at least for working outside.
That's my standard excuse for not getting a lot done in a summer month but then there were so many little things to catch up with at this point in the build that it is somewhat hard to show something for the time invested.

One of the little things was to browse through all previous sections in the manual and find the left out steps - mostly related to safety and that sorts of things - and to mark them in a way that would allow to quickly find them again and tick them off. Some of the work will have to wait until I can fully set up the fuselage for final rigging which won't happen until I moved the build to a hangar, so the markings will come in handy then.
Then I wanted to finish up the lower area of the engine installation so I can eventually install the cowling and leave it on (until certification, that is).
One of the steps involved was trimming off the exhaust pipe to a more usable length that would not interfere so much with the installation of the lower cowl. I had marked a length of 3" before when I had the cowl on and now the pipe cutter had arrived to get a clean cut. It wasn't that easy though as I refused to remove the exhaust another time to be able to fully spin the pipe cutter around and so I ended up with a short stretch of metal that still had to get sawed off.


I still managed to get a nice smooth edge around the cut line.


Then I installed the oil cooler and was pleased to find the critical left oil line to possibly be long enough to allow the cooler to connect to its somewhat moved forward position. I know, now that I expressed this hope, that the hose will be just a millimeter too short and require full replacement. Does this bother me at all? No, not a least little bit! It's what you get used to in more than 3 years of doing this.

After this I decided to give the oil cooler opening in the cowl a last little touch up. After all, the plan is to leave the cowl in place for a while, which means it should really be done at that point.
It turned out that the upper lip of the opening was a bit rough and needed some filling with micro-ballons and epoxy. The pot life went down from 30 minutes in winter to a bit less than 5 minutes in 107F. Enough for the small filling job and actually helpful in curing it quickly.


Catching up with leftovers also meant to finally drill the drain holes in the cowling duct. With my modification this turned out to be a bit more challenging than what it would have been with the unmodified duct but I was still able to do a good job.



The side drain hole was easy as it had not modification.


While the epoxy was curing (no chance to sand on the same day despite the heat) I was watching the surrounding wildlife in its attempt to get a relief from the high temps.




We keep those spots watered daily so the jacks, bunnies and quails are getting at least a slight cooling when they wait there for dusk. 

A day later, I sanded the upper lip of the air intake and noticed happily that that appeared to give it that desired perfectly smooth entry I was looking for.



Now, filling the springs on the exhaust with RTV and fitting the oil cooler to the cowl are the next steps but I will wait until it is a little cooler...

Monday, May 27, 2013

Heat Shield Applied

I was going to apply the heat shield onto the inside of the lower cowl today. My wife had already prepared the template.


As you can see we were going for a 2-piece approach. Let me tell you right now that this did not work out too well, so you might want to read ahead a bit before following my steps.

The templates were put onto the aluminum foil to mark the outlines.


I generously cut out the pieces along the marked lines.


Before I could think about applying them to the cowl I wanted to make sure the exhaust pipe would actually fit through the hole in the cowl. Therefore I needed to attach the muffler that had been removed previously to have easier access to install the oil lines.


At this point I decided to fix an issue with the actuator line that moves the heater door rubing on the lower oil hose.


It just feels better to know that the metal plate could not directly work through the fire sleeve and the oil hose before going through the vinyl hose first.
This thing is pretty much out of sight once the lower cowl is installed and so I wanted to give it some extra protection.

Now I wanted to get the lower cowl on to see if the hole fit the exhaust pipe. However,  getting that cowl on to begin with was anything but easy!


First you have to thread in the pipe while trying not to completely scratch the nose wheel arm, then you can actually get the cowl up and in position.
It didn't fit too well yet!




Obviously, the side and the front of the hole where interfering. I decided to loosen the copper nuts holding the exhaust pipes at this point to allow me to wiggle the exhaust a bit to get a better fit.
That allowed me to put the lower cowl fully in place but still the outboard side needed significant trimming.



I drilled some holes along the line and then used the Dremel to remove the material.



I also marked the pipe for later trimming which should make it easier to put the cowl back on.


Now that I had the muffler in its final position, I removed the cowl and re-torqued the copper nuts, trimmed the exhaust hole in the cowl and continued with the application of the heat shield.
The lower part went on ok but I immediately noticed that the left side piece had to get cut off from the lower piece.


Second part was the little right side piece and then the left piece went on. Some of the trimmings were used to fill some bald spots.


Then I applied the epoxy around the edges to seal the foil in. I also used this batch of epoxy to apply the little notice tag on top of the air tunnel.


That was it. Now I have to think about the best way of cutting that pipe. The room is a bit tight for a pipe cutter but that would certainly make the cleanest cut possible. I'll take some measurements and see what I can find.