Showing posts with label Section 23. Show all posts
Showing posts with label Section 23. Show all posts

Sunday, April 17, 2011

Section 23 Completed

Finally, after almost 70 hours of work, the exhausting section 23 has been completed today!
It started with the installation of the air sickness detectors or air vents as they are usually called. Check Dave's blog if you don't understand why they are also called air sickness detectors. I found that a much more precise term than air vents.


This required some match-drilling. Right side clecoed and ready for the drill bit.
Nothing really fancy about this step only that I had some trouble with the final installation of the vent doors because I didn't precisely remove the material Van's had asked for and so the doors wouldn't fully close due to some interference. It was much more time consuming to remove the material now that the door had been riveted together from its various parts but I managed and so eventually the vent doors were installed.


Then the last step was at hand, installing the piano hinges that will eventually hold the lower cowling to the fuselage. This again required some mach drilling and also some priming of a spacer that sits under the hinge.
This was all quickly thrown together and riveted on, so all you get is the photo when it was completed.


And this completed section 23. Horray!

It was around noon and getting real hot (95F today) but it was too early to call it a day, so I went inside the shop, turned that great A/C on and closed the door.
I wanted to continue on section 24, which is the rollbar installation. The parts were already primed on the inside but I hadn't riveted them together yet because I read in other blogs and in the forum that people had issues following the plans order. It seems that the fit of the rollbar is pretty tight and it is very hard to slide the completed rollbar onto the base pieces on the fuselage. My plan was to complete part of the riveting off the fuselage but leave the two halves separated for now. Try a test fit on the bases and then rivet the parts together while they are already clecoed to the bases. My hope is that by doing that I won't have an issue trying to slide it over the bases afterwards.

So, I started by riveting together the two sides of each half.


And then added the inner strips to the aft half.


That was quickly riveted.


While at it I also added the modifications for the little "reading" light that will get attached to the front rollbar. I also drilled the holes for the wire into the flange of the aft rollbar and put the snap bushing in. I didn't feel like trimming the flange (and ruin the looks) and so I ended up using clear silicone RTV on the inside of the flange to glue the snap bushing in. The side of the hole is so deep that the snap bushing wouldn't snap in without being recessed - or glued in)



The final step was then to open up a pilot hole to 3/8" in the right rollbar attach plate on the fuselage to accept another snap bushing for the wiring. This one can get drilled wider from below and allo wthe snap bushing to get properly seated.


And that concluded another busy weekend.

Saturday, April 16, 2011

Side Skins Riveted

Friday I finished the last preparatory tasks for the grand finale. This included painting the longerons where they'd be visible in the interior and some small parts. I sprayed the paint a bit too wet this time (still not sure how that happened) but I was able to just avoid runs.


The paint on the parts was well cured after 16 hours and I continued to aforementioned grand finale, the actual riveting of the skins onto the fuselage.


The longerons were quickly put back into place to receive and hold on to the skins.


See that painful looking arch in my back? It was about then when I realized that I should get a seat to do this.

After clecoing both skins on and setting half the rivets I was ready to start the enjoyable part of riveting.


An hour or so later the rivets were pulled and the final rivets seated.


Left side was soon done and relieved of any blue tape and no longer needed clecos, On to the right side...


Same game but less pictures. After two more hours the task was completed and we now officially have a .... boat!
This completed page 23-06 which took me almost 17 hours to finish.

Thursday, April 14, 2011

One Side Skin Ready

I didn't quite finish my secret task list that I had aimed to do tonight. This was possibly caused by all the other things I had to do before getting home quite late. All I could do was to relief the two side skins from their blue vinyl covering and rivet the nutplates in place on skin.


You can't see it in this picture but I deviated from the plans a bit. Van's asked for the nutplates to be installed with those pesky little pop rivets. As all the holes were easy to access for dimpling except for 3 (Van's says two would be hard to get at but I couldn't get to 3), I chose to use AN426AD3-3.5 rivets to install the nutplates and use the pop type only on those 3 holes where they were necessary. Once the pneumatic squeezer is set up for a certain rivet length I find it particularly easier and faster to use squeeze rivets than those little pop rivets.
On the second skin I only got as far as to put the nutplates in place with a cleco in one hole on each of them.

The final task of the day before closing shop was to hang up a motivational picture.


It shows a picture a fellow builder sent me. He obviously got ahead of me and also got a really low-cost engine solution installed, so he'll be flying very soon now. I hung this up to remind myself of the final goal and to keep the competition going... :-)

I hope to finish the nutplates tomorrow evening and maybe to hang both side skins back on the fuselage.

Wednesday, April 13, 2011

Preparing Side Skins

I didn't quite finish the next task of preparing the side skins but I got almost through. I deburred the longerons and touched up some scratches in the primer (knowing that it will likely get scratches in the same spots again). Then I cut off the little match-drilling template tab on the end of both side skin. That was tricky task as the cut will be visible on the finished plane and so I wanted to make sure that it would be a nice cut.
The tool of choice for a nice cut is the bandsaw but the skin is quite awkward to handle alone and I certainly didn't want to scratch the nice paint job either.
So I had to find a way to get the bandsaw close to a flat work bench.


The bandsaw on a bucket got me within 1 or 2 inches of the height of the skin and that was enough to work with. I got two nice straight cuts out it and deburred the edges of the cut.

Then I carefully broke the rear and bottom edges of both skins. I took my time with that to avoid to accidentally run the tool into the skin which happened with the tailcone skins once. That would have been really ugly. Didn't happen this time.
Then I dimpled the holes around the triangular cutout on both skins.


And before the end of the day I managed to spray some primer onto those pesky little parts that I had overlooked before and that need to get painted before they can be riveted in place.


So I didn't get to install the nutplates in the freshly dimpled holes around the triangular cutout but this will hopefully get done tomorrow night. After that I think I will be ready to cleco everything back in place.

Tuesday, April 12, 2011

Longerons Drilled

What a milestone! At least it feels like one. Today I drilled both longerons. A last time I verified the correct adjustment and then I just went ahead and drilled 74 holes on the left side. You can hardly see it in the picture. Look at the upper horizontal line of rivets holes that contain clecos now.



Then I went ahead and used the now available clamps to hold down the skin on the right side.


74 holes later (that's 148 all together) all the clamps are gone and clecos fill the freshly drilled holes (not that they would care).


Inside looks good, too.


The whole session took about 3 hours. Maybe I need a new drill bit ...
I also removed all those clecos, the skins and the longerons again as they have to get deburred. So now the fuselage looks just like a few days ago.


When everything is deburred and the primer touched up, I will be ready for the final installation and some serious riveting. The skins will have to get their lower and rear edges broken, too, but that should be fairly easy. I just have to be patient and not try to rush the breaking to make sure I don't ruin the skins right before installation.

Monday, April 11, 2011

Right Side Skin Clecoed

I went straight home from work to deal with my little gap problem from last night. A lot of builders helped me by looking at their planes and letting me know if they had a gap, how much and how wide. Turned out that I suspected to have a vertically bent longeron on the left side. This is a result from banging on it which I did on the left one. The angle tries to evade the force by not just bending in the direction you want it to but also in the perpendicular direction. This creates a vertical (unwanted) bend. I thought I had made sure that I had taken this out before putting them away.
So I rushed home, took a closer look at the gap (which appeared to be smaller today) and finally I decided to give it a shot by pressing down hard where the gap was widest. I heard a metallic sound followed by a sudden movement and .... the gap was gone. Just like that. The longeron must have not been perfectly sitting on the posts and the pressure made it move a little more. That was all it took and the skin was perfectly matching the canopy deck.
I decided to hang the second skin and make sure that the right longeron aligned correctly as well.



It turned out to be perfectly aligned right from the start, no pressure required. I clecoed everything in place and verified the correct alignment multiple times.
That's when I decided that I didn't have the guts to start drilling just yet. If anything is wrong I won't be able to fix this. I would have to throw out the longerons and do it again. I'm just going to let it sit over night and take a fresh look at it tomorrow and probably start drilling the first holes. There are a lot to get match-drilled and this task will take a while.

Sunday, April 10, 2011

Left Side Skin Clecoed

It took quite some time before the day reached a temperature that I was willing to accept for outside work. When it was getting cozy, it was already late in the afternoon and all I could do was hanging the side skin on. The gusset problem was solved by just clecoing it on. It didn't look like this was an integral part of the structure's strength.


Looks nice already, but take a look at this:


I think this gives a real good first impression of how nice the interior is going to look!

After admiring the beauty of the painted skins I went ahead and clamped the upper edge of the skin to the longeron.


Looking a little closer I saw a problem with the fit which I don't know how to resolve. Hopefully, one of you guys ahead of me is reading this as a helping comment!


This has been taken around the center of the canopy deck where it's the worst fit. The gap is about a 1/32" and because the skeleton defines the position of the longeron there and the skin is positioned by all the well aligned holes, I don't see how I could do anything to make this fit better. Did you guys see the same kind of gap?
The only thing that has been added on the longeron and the canopy deck piece is some primer. The coats are quite thin and cannot add up to 1/32". Any ideas???

Saturday, April 9, 2011

Biting the Bullet

After installing the brake lines, there's really not a lot left that would be worth holding off putting the side skins on for. Even worse, doing so would make it quite tricky to continue at this point and probably cause all kinds of other, yet unknown, problems that could cause a lot of lost time.
So I decided to put the stucco work in place, the arm rest and the canopy shelf and getting ready for match drilling those dreaded longerons.


Unfortunately, I overlooked a tiny little gusset (2 of them, one for each side) that was supposed to get riveted in place now and it therefore should have been painted. This stopped me in my tracks but I wasn't all angry about this. At the time I needed the gussets I was working outside for about an hour at 43F which is not exactly enjoyable to me. Nice excuse to go back into the house. Brrrr!

As I don't have a lot of parts that are ready for painting right now - I think there are two little parts that needed there opposite side taken care of - I will probably do a very small paint job tomorrow, just so I can get these gussets installed. The rest of the job is then hanging up the side skins and match drill them into the longerons. There are a lot of holes to drill and this will be tiring as well as a messy job. Not sure if I am going to be up to it tomorrow...

Friday, April 8, 2011

Side Skins Painted

So I rushed home after work to spray paint at a good temperature of around 75F. I mixed a little bit too much paint but this better than running short like last time.
Here are the first shots about 45 minutes after painting. The skins and some additional stuff are still sitting in the paint booth. Temperature is now falling quickly with the cold front moving in and when we got down to 68F I had to do something. Well, I put the space heater in the booth which is safe as the Stewart paint is not flammable.



Later tonight when the paint is dry to the touch I'll probably move the parts into the shop and heat the area there. Might keep the temperature better than 4mil plastic ...

Update:
I did remove the parts from the paint booth and put them all in the shop for overnight heated curing. Looks pretty nice, I think I am getting better with the paint gun.

Thursday, April 7, 2011

Paint Primer Shot

Change of plans. The weather forecast looks seriously bad for the weekend for shooting paint as the max temps will be close or below the minimum of 65F. This might be considered warm in Ohio this time of the year but we will drop from 80F because of a storm system that's moving through. To make sure I can shot some paint tomorrow evening, I made sure today I got primer applied to all the parts that need painting.



See the rollbar unprimed? I thought about this for quite some time and then decided to hold off on priming the separate parts for now. I think it will look much better if I assemble the thing first and then prime and paint right before riveting it to the rollbar blocks that will hold the thing on the fuselage.
I also primed the side skins but I never took out of the paint booth or dared to open up the entry as the wind was blowing a lot of dirt around today. So all I can show you is an pressurized paint booth and you have to take my word for it that it contains two primed and drying side skins.



I also got the main brake lines installed. Once I had enough length for the two lines it was a piece of cake to finish this part of section 27. I won't finish this section before I finished the wiring as part of the Finish Kit as the pedals would be in the way.

Ready for connection to the brake cylinders.

Filling up the void in the center tunnel. The last slot in there has to be filled by wires.

Waiting for the landing gear and the brake installation.

Monday, April 4, 2011

Side Skins Prepped

After work I used the warm weather before sunset to scruff and prep the side skins and some additional parts that will soon get used. Sunset came a bit too early and I couldn't finish all the parts in my stack so I will finish the rest tomorrow evening.
The I will set up a corrosion primer session for Wednesday and a paint primer session for Thursday or Friday to be all ready for painting on the weekend.
No photos from tonight, sorry.

Saturday, April 2, 2011

A Lot of Different Things

Phew, that was a busy Saturday and we were getting close to a 100 F while I was working outside. Silly me!
I finished the short brake line hoses that get attached to the master cylinders. As I didn't pay too much attention to the brake line length that were requested thereafter I foolishly cut the short lines off of one 15' coil. MISTAKE! If you read this and haven't done this yet, make a mental note to revisit this page before getting yourself set back. The 15' coils that are provided are supposed to be used evenly. So if you cut off all the lines for the left brake of one coil and then all the lines for the right brake from the other it will work out fine. A little note in the instruction would have been nice ... Anyway, my order on another 9' of brake line is in and until then I'm just going to let it sit as I won't be able to finish it anyway.


To keep me busy, I then went ahead and made those cutout in the side skins to allow the wing spars to get through. I used the HF pneumatic nibbler for this, as well as a rough hand file and a 1" SB wheel (the cutout is supposed to be a bit less than an inch wide, but the SB wheel was well worn, so it fit in, I also made the cut out a bit wider).


This is the left side which has some obstacles close to the left wing root that I made some room for. The wings cover this cutout, so it doesn't have to look extra pretty. I guess this is functional enough.


It didn't look like my right wing needed any extra clearance. I'm not completely sure though as I store the wings outside and taped all the openings up quite well. As far as I could see this should be fine and if not, I can fix this later before pushing the wings in for the first time.

Then I did a lot of deburring work to get ready for next weekend's spraying session, I hope to do the prep work including priming during the week at night.


That was enough work for a hot day but I don't know what drove to me to open the next can - namely section 24 - which deals with the rollover bar.
Whatever it was, it made me cleco this structure together and then start final-drill all the #40 holes in the flanges to #30. It didn't look like much, but it sure took me quite a while. Partly because I only had the suggested amount of #40 clecos. That was just enough to cleco one side of the rollover bar to the inside reenforcement strips but that was enough to start final drilling and then removing the #40 clecos, replacing them with #30 which I have a lot more of.


Here you see the forward rollbar half clecoed to the outer support strip. Another one goes on the inside and that ate up all my silver clecos.
I forgot to take more photos during the process of drilling and replacing clecos. The rollbar gets pretty heavy because of all the clecos in it.


Here you see the parts taken apart after finishing the drilling, ready for deburring. It was 6:30pm at that point and I had to yet clean up the mess I made on the patio. Tons of shavings and sharp nibbler leftovers had to get vacuumed up.

Tuesday, March 29, 2011

Section 26 Completed

Besides getting further into section 23 I also completed the seat backs (except for installing them in the fuselage as they'd be in the way). First I have to add a shot that I omitted yesterday which shows the center support bracket fully installed.


If you look closely, you'll see that I have already started to install the stucco for the side skins. I riveted the vertical post on and sure enough scratched the paint on one of the panels in the left front because there was hardly any room to get the riveter in place. Yikes! I can't even describe how much that irks me!
Anyway, I also match-drilled the arm rest and deburred the holes.


But when it was time to actually rivet them onto the vertical posts I hesitated and decided to wait with this step. The reason for it is the same why I don't want to rivet the side skins on just yet. Accessibility to the tunnel area and the inside of the fuselage. Once the stucco is riveted, getting in the center of the fuselage might require turning the structure on its side and why do that if I can avoid it and delay this part of the installation?
I've decided to finish section 26 instead and will then probably continue with 27 next as this one would benefit from easy access to the lower forward fuse. Next might be installation of the wire harness before finally closing up the sides.


Here are the finished seatbacks with secured hinge pins.


And this is how I left the fuselage. I riveted the little stow pin supports onto the arm rests and put them away until final installation.

Section 26 seemed to have taken me 12 hours straight, including priming and painting (estimated, as I did this along with other parts). Overall I'm now around 580 hours total and no end in sight yet :-).