Brake System Bled

I managed to flush the brake system once again over the weekend. Hopefully, we removed all the air now and the system will stay leak-free.



Speaking of leak-free, I tried the brakes with my feet while sitting in the plane, to make sure that they felt air-free and gave a good, hard response. This is what triggered the leaks last time around.


So, after this was all done and I was about to cover up the plane for the night, I checked the fittings for leakage by touching them with a paper towel. On the right side, on the lower fittings for the left and the right pedal, I got a minimal response. The response was so little that I cannot say, if this was brake fluid or something else or if it was some fluid that might have been on the tips of the pressure lines and got wiped onto the fitting when hooking up the lines.
I put some newspaper sheets below the pedals again and will check in a few days what happened. If it is a minor seepage on the right side, I would leave it alone and fix it with the annual - once it is registered.

Wednesday, March 27, 2013

Brake System Filled

I threw in a short work session when I got home, so I could determine if the brake system is now leak free. As I mentioned before, it might take a few days before the leaks show, so I wanted to fill the system as early as possible.
My wife was not available, so I could not bleed the system as I had previously done - pumping fluid while a second pair of hands is vigorously moving the pedals back and forth. That way I got the last bubbles out of the brake cylinders where they love to hide.



You can see about 1.5" inches of air slowly moving backwards (well, no, you can't SEE the movement, you'll have to take my word for it) in the lines for the left brake. I expect the same to happen on the right side when it had some time to settle. I filled the right side last and it usually takes some 10 minutes before the air is creeping back.
For filling I used the trusted setup from last time.



Having a bit of experience with this now, I did not waste a lot of fluid like I did last time. Not that it would be important as the quart is way too much for filling the system - even with extended bleeding.
I hope I can wash the last bit of air out on Friday evening. By then I might also have a first result on the leak test.

Monday, March 25, 2013

Pedals Re-Installed

After coming home from work I felt like cleaning up the left-overs from yesterday. The pedals had to go back in and it felt like a good task to do for an evening worth of work. I had never done it the "right" way, while the fuselage was on its belly, so it was a learning curve for me to overcome. It turned out that it was easier than putting them in while the fuse was on its side.


Here the left and the middle upper blocks go in with the left pedals. This is just to get the thing set up and stabilized. It has to come half-way out again to insert the right pedals in the bearing blocks - which you see in the following picture.


Fiddling with the lower blocks and the bolts was a job where I wished I could be hanging upside down from the ceiling as access would have been much easier. My calves and back muscles will certainly be sore tomorrow.
Notice the helpful bungee cord to position the pedals in their aft-most position. Really handy when you don't have access to a second pair of hands.


The final step was to re-attach the hydraulic lines - mainly to cover up the holes Arizonan insects love to nest in. I was tired at that point and just hand tightened them. I also re-attached the rudder cables which simple, except for inserting the cotter pins. You just need two hands for that job and getting two arms under the instrument panel while being half-way outside the airplane is not really easy to do.
This repair, which I'm not certain is complete yet, has taken me 5.5 hours so far. Not bad at all; I really don't understand why I was dreading it so much. I guess, it was more a psychological block than being put off by the time it would take.


Now, I have to tighten those line fittings and then do some magic with cable ties that I had to cut in order to remove the pedals. That should not take too long and then I'm off to bleeding the brakes again and see if this all was worth the effort.
After considering the next steps on my day off (from the shop), I decided to leave the cable ties where they are - in the bag - at least for now. I will tighten the line fittings and then go straight to filling the system with brake fluid and bleeding. That way, I can see if this effort fixed the problem before I put obstacles in the way again.
Actually, it might take a few days for the leaks to show if there are any. I remember that last time when that happened, it first appeared to be dry and it was only after a few days when the leaks showed.

Sunday, March 24, 2013

Fittings Re-Fitted

After finishing the MLG SB, I had to do one extra thing before being able to refill the brake system with fluid. That one thing was to remove the pedals from the plane, remove the fittings and clean them and re-fit them to the brake cylinders - this time with Bakerseal as sealant.


I was able to remove the pedals with just removing the bearing blocks and not removing the little metal shield that holds the wires off the pedals. That earned me a deep scratch in the powder coating, that I patched up with primer. I will have to protect this and be extra careful when reinserting them into place.
Other than that the pedals came out easier than I had expected. Once they were removed I started on removing the fittings and cleaning the threads from the previously used sealant.
The black rings around the fittings shows the old sealant still in place.


I cleaned the fittings by repeatedly submerging them in MEK and then rubbing off the sealant with a rag and also brushing the threads with a brass brush. Then I dried the fittings inside out, and particularly the threads, with compressed air before applying a thin coat of Bakerseal and reinserting them.
When reinserting, I tightened them with a standard length 3/8" wrench until I felt a strong resistance. Then I used the adjustable wrench of 8" length to turn it at least one more turn until I felt a very strong resistance and got the feeling that I might get stuck going another full turn.



The 45 degree fittings went in much deeper than the 90 degree ones. All in all, the 45 degree fittings were turnable until only one thread showed, while the 90 degree ones show 4 threads.



Comparing this seating depth with what I saw on Dave's blog, I should be save to put them back into the plane now. I certainly do not want to remove them again!

Saturday, May 5, 2012

Section 27 Completed

I almost completed two sections today but because of the OAT probe supposed to get installed on the left side where the fuselage is resting on, I couldn't fully complete the second one yet.

The day started early due to the increasing heat. We are in the low 90s today. I started by tightening those nuts that hod the rudder pedals to the shelf. That's when I noticed that I couldn't bottom out the right pedal. It was interfering with the fuel return line at the mounting point of the ruder cables. It is really very tight in that tunnel. No room has been left unused. Fortunately I could bend the return line a bit to give the rudder arm enough clearance. I also tied the cable bundle to the return line to avoid interference with the wires and the rudder arm on the opposite side.

Then I hooked up the lines to the brake reservoir...

... and to the actual brakes.

Then I went in the shop to start the work on the left and center panels. The left one needed some extended countersinking for the marked nutplate holes and for the mountain screws.

I also tried to find a home for my PCAS and I was hoping it would fit in that little spot above the ignition control. I added some markings on the panel to see how much clearance I had - if any.

As you can see, it's just not enough room to go there. I tried the right panel as the top center space will be reserved for the backup GCS.

Yep, that'll do! The work on this will have to wait until I have received my instruments. The Winter ASI with 510 degree arc is on special order as I wanted to get the markings done by the factory. I don't think the ASI will get here before next month. The altimeter should get here by next week. I found install sheets for Winter online, so I should be able to drill the mounting holes without having the actual instrument.
But before that I went back to the left side. The APDC switch hole had to get drilled. Positing was first.

And then it was drilled, using a #30 pilot hole and the step drill to open it up. All done on the drill press.

Please note that the plans are incorrect in asking for a 1/2" hole to be drilled. A 7/16" for the switch is totally sufficient.
It was time to countersink all the holes for the mounting screws AN507 #6.

Then I opened up the hole for the fuel pump switch that I intend to put where Van's had me put the APDC switch. I still think it's not easy to get to that location with the throttle being in the way. However, this is perfect for the fuel pump switch as this is usually supposed to be and stay on.

Back to the left panel. The stiffener angle had to get riveted to it. However, the APDC switch mounting nut would likely interfere with a small part of it. So I marked the area that should get removed.

The material was quickly removed with the SB wheels.

Then I riveted on the angle and the nutplates in the left and center panel.

Now it would be time to put the final finish on but I am not yet decided what to do and so I put them away for later. The right side needs the cut-outs done first anyway.
Looking ahead in the gear section, I found that a few steel parts could use some priming.

Then I spent some time cleaning up in the tunnel. Tightening cable-ties, snipping off the ends and final routing the static line in the tunnel.

The tailcone is still waiting for the brass screws to arrive, so except for tightening the cable-ties a bit, I left it alone.

I'm not sure what to do next. I could go back to the canopy but final finish would require the fuselage to be upright. I've identified some parts that need painting in the interior color and I still have some of the Steward paint left. Maybe I go ahead and do that, so it can cure over the hot and dry weekend.
I also still need to fit the end fairings for the rudder and the vertical stabilator. So that's also a choice for tomorrow.
Either way, I am getting close to putting the fuselage back on its belly.

Friday, May 4, 2012

Rudder Pedals Installed

It was a fight of epic proportion, but I prevailed!

Let me report in proper order though.
First, I worked in the tailcone. With the proper connectors from Ace I could hook up the PE static line to the stub that I had left from the previous static installation. This hose is now used for the pitot line. What made this task difficult was the little leftover stub. That one is made from Nylon whereas the new line is made from PE. The PE seems to stretch more willingly to slide over the hose extension piece. The Nylon was not easy to persuade. I used a bit of Baker-Seal on the Nylon barbs and a pair of pliers to get a firm grip on the barb while pushing the Nylon hose over it with the other hand. It worked put after a while.

Then I made the T extension that runs from the tapped static line in the upper center of the bulkhead to the ADAHRS static port. It's easier to hook this up outside of the tailcone. Then I cut the static line in 12 o'clock position and inserted the tee. I also had installed the connector before putting everything in the tailcone but I let the nut loose for screwing it onto the ADAHRS.

I also drilled out the ADAHRS bracket again and removed the nutplates. Then I located the screws and nuts that Van's asked you to use to install the ADAHRS and checked them for magnetism. Guess what! The screws as well as the nuts are magnetic. I decided not to install anything at this point and ordered a pack of #6 brass screws and nuts, along with some nylon washers to separate the brass nut from the aluminum flange to avoid corrosion.
So it was time to move to the front of the aircraft to install the rudder pedals. Oh what joy!
Some prep work came first. I taped the two tubes together in the hope to have it easier to control them inside the fuselage.

Then I removed the nuts and washers and put the bolts in from the other side. Because of me inserting the assembly sideways, I couldn't rely on gravity to help me keep the upper blocks in place. That's why left the bolts in. They have to get gradually removed in order to slide the thing in. There's hardly any room in there, so heavy cursing is in order!

If you do this sideways, focus on the upper block and cant the whole thing a bit outwards so this upper block is the first sliding under the shelf. As soon as the bolt blocks movement, remove one and move on until the second one makes contact. At that point release the cant and see that you get the center block in beyond the first bolt, then work on the lower block. It took me a while to figure this out and all that in awkward position, with waning light and no room to work, while holding the assembly in one hand (did I mention it gets heavy after a while?). The fact that I first had to clear the two short wires and the static line didn't make it easier either. After about half an hour of fighting and scaring my neighbor with my cussing, I had it in and one of the upper bolts some threads into the nutplate. I just hope I never have to get these out again!

I started the two upper and the two lower bolts until they started resisting (need a drop of Boelube each), then I removed the center bolts and installed the little wire support angle (page 31-13 or so) and engaged the two bolts in threads as well.
Getting that tie wrap around the wires and through the two holes in the angle was no fun. I think, I'd do that first, before mounting it to the plastic blocks had I to do this again.

It looks like I can finish section 27 (rudder pedals) and section 31 (basic wiring) tomorrow. That'd be a nice change over starting new sections all the time!

Wednesday, May 2, 2012

Brake Lines Done

The first thing I worked on is "fixing" the ADAHRS brackets. Due to a post on VAF I looked ahead and found out how the ADAHRS is actually mounted to the brackets. Yuck! Van's wants you to jiggle the ADAHRS unit while putting little screws in from the bottom and counter them with little metal lock nuts. I DON'T THINK SO! I will install the ADAHRS and the rest of the avionics with the fuselage on its belly or even on its gear. So I really don't want to lie down in the tail cone just to install this thing.
I drilled out the brackets and installed nut plates K1000-06 in the four places. That way I can at least egt along by using two hands. One to hold the unit and one to screw in the screw.
Update: Not such a good idea! I will remove these nutplates again when I get home tonight. They are made from steel and this could confuse the magnetometer that's built into the the ADAHRS.

After I was done with the reinstallation of the ADAHRS brackets, I caught up with some loose ends. In this case the brake lines. I think it's about time to install the rudder pedals now. Please correct me if I'm delusional about this point! In order to have everything in place for the installation I had to install the brake fluid reservoir.

The holes in the flange did not line up with the holes in the firewall, so I had to use the round file to widen one hole a bit. I put some Baker-Seal on the NPT end of the Y-fitting for the brake lines and screwed it into the reservoir from inside the cockpit.

It took a little force to get the other end to the 3 o'clock position. I didn't think it would take another full turn, so I stopped and connected the second line.

The final step was to route the two brake lines through the cushioned clamp and to screw it onto a post. Because of the inherent springiness of the clamp, this required a second clamp to hold the cushioned one down enough so the threads of the AN3 bolt could make contact with the nutplate.

This worked out quite well. As soon as the bolt had good contact with the nutplate the compressing clamp fell off and I kept on screwing the bolt in with now problems.

It's funny but I couldn't find instructions in the text to actually manufacture these two brake lines. The instructions are in a figure on the last page in Section 27 that shows how to connect these lines to the brake pedals.
And this although the manufacturing part actually needed quite some time. Not because it was complicated or a lot to do. No, it took me overall probably an hour to just find the parts. In my limited space I had to get very creative when I put parts from previous kits away for the next kit coming in. And I just couldn't recall my previous genius so easily to find the parts when I needed them tonight. Now, I feel that I have a better grip on where other parts might be that I soon could use. But I guess, I might forget this again if I don't use them soon.
If nobody objects, I will put the rudder pedals in tomorrow evening.

Thursday, April 7, 2011

Paint Primer Shot

Change of plans. The weather forecast looks seriously bad for the weekend for shooting paint as the max temps will be close or below the minimum of 65F. This might be considered warm in Ohio this time of the year but we will drop from 80F because of a storm system that's moving through. To make sure I can shot some paint tomorrow evening, I made sure today I got primer applied to all the parts that need painting.



See the rollbar unprimed? I thought about this for quite some time and then decided to hold off on priming the separate parts for now. I think it will look much better if I assemble the thing first and then prime and paint right before riveting it to the rollbar blocks that will hold the thing on the fuselage.
I also primed the side skins but I never took out of the paint booth or dared to open up the entry as the wind was blowing a lot of dirt around today. So all I can show you is an pressurized paint booth and you have to take my word for it that it contains two primed and drying side skins.



I also got the main brake lines installed. Once I had enough length for the two lines it was a piece of cake to finish this part of section 27. I won't finish this section before I finished the wiring as part of the Finish Kit as the pedals would be in the way.

Ready for connection to the brake cylinders.

Filling up the void in the center tunnel. The last slot in there has to be filled by wires.

Waiting for the landing gear and the brake installation.

Saturday, April 2, 2011

A Lot of Different Things

Phew, that was a busy Saturday and we were getting close to a 100 F while I was working outside. Silly me!
I finished the short brake line hoses that get attached to the master cylinders. As I didn't pay too much attention to the brake line length that were requested thereafter I foolishly cut the short lines off of one 15' coil. MISTAKE! If you read this and haven't done this yet, make a mental note to revisit this page before getting yourself set back. The 15' coils that are provided are supposed to be used evenly. So if you cut off all the lines for the left brake of one coil and then all the lines for the right brake from the other it will work out fine. A little note in the instruction would have been nice ... Anyway, my order on another 9' of brake line is in and until then I'm just going to let it sit as I won't be able to finish it anyway.


To keep me busy, I then went ahead and made those cutout in the side skins to allow the wing spars to get through. I used the HF pneumatic nibbler for this, as well as a rough hand file and a 1" SB wheel (the cutout is supposed to be a bit less than an inch wide, but the SB wheel was well worn, so it fit in, I also made the cut out a bit wider).


This is the left side which has some obstacles close to the left wing root that I made some room for. The wings cover this cutout, so it doesn't have to look extra pretty. I guess this is functional enough.


It didn't look like my right wing needed any extra clearance. I'm not completely sure though as I store the wings outside and taped all the openings up quite well. As far as I could see this should be fine and if not, I can fix this later before pushing the wings in for the first time.

Then I did a lot of deburring work to get ready for next weekend's spraying session, I hope to do the prep work including priming during the week at night.


That was enough work for a hot day but I don't know what drove to me to open the next can - namely section 24 - which deals with the rollover bar.
Whatever it was, it made me cleco this structure together and then start final-drill all the #40 holes in the flanges to #30. It didn't look like much, but it sure took me quite a while. Partly because I only had the suggested amount of #40 clecos. That was just enough to cleco one side of the rollover bar to the inside reenforcement strips but that was enough to start final drilling and then removing the #40 clecos, replacing them with #30 which I have a lot more of.


Here you see the forward rollbar half clecoed to the outer support strip. Another one goes on the inside and that ate up all my silver clecos.
I forgot to take more photos during the process of drilling and replacing clecos. The rollbar gets pretty heavy because of all the clecos in it.


Here you see the parts taken apart after finishing the drilling, ready for deburring. It was 6:30pm at that point and I had to yet clean up the mess I made on the patio. Tons of shavings and sharp nibbler leftovers had to get vacuumed up.