Soon after starting the riveting joy, the main wingtip skin was completely riveted and I clecoed the triangular closeout in place. I didn't want to start match-drilling at night with bad lighting and a whole lot of cold moist air from yesterday's extensive rain but I at least checked that the skin lines appear to be parallel.
Tomorrow I will finish the right wing and then get the nav light fairing matched and ready for riveting. With a little luck I should be able to join the Pro-Seal club and finish the nav light installtion on the wings during this weekend as well.
No comments:
Post a Comment