Oil Cooler Fits!

I was so concerned about my modification of the oil cooler position possibly causing problems when attaching it to the cowl and installing the cowl.
Those concerns were not warranted as it turned out that wit a slight modification of the routing of the right oil hose that attaches to the cooler, the system fit perfectly.

It first did not look so good though when I first tried to fit the cowl on. I installed the cooler guides on the bottom cowl as the first step.


In this picture you see the conventional routing of the right oil hose.


With a lot of pulling and cussing the cowl finally slipped into place (or better, yet, was forced to do so). That looked only good from the distance.


On the bottom curves though you could see that the cowl was under a lot of tension and pulled to the left (or pushed, as it later turned out).



So what was causing this? There is so little room in engine area that I could not take a picture of the interfere nor could I myself see it. Bending my arm in ludicrous ways to get my finger tips to follow the oil hoses and feeling for possible contacts, I finally found the reason. The fuel spillover line installed as a patch to the need of Rotax installing a different mechanical fuel pump that vents fuel overboard in case of a malfunction, prevented the oil line from moving up where the oil cooler wanted to go.
This might only be caused by me moving the oil cooler about 1.5" forward as I also had to move it slightly higher than initially planned for. But the clearance would be minimal (if any) in the original position as well.
The reason the oil line is interfering with the aluminum fuel vent line is that the oil line is pointing about  30 degrees toward outboards with the original routing and therefore crossing the vent line. I saw that if I could persuade the line to attach straight from the aft to the cooler, that the line would then clear the vent line and had a chance to bend out of the way further aft.
I tried a few approaches before I finally settled on this one:




The only problem I saw with this routing was that the lower water hose is pushed slightly towards the exhaust and could possibly touch the spring after a while. I planned to apply RTV between the spring and the hose in that area.
There is now only a minimal push to the left as you can see by the oil cooler mounting holes being just slightly out of position.


With this setup the cowling went on almost as easy as before without an oil cooler and there was practically no tension on the cowl.





Before taking the cowl off for the last touches on the lower engine installation, I thought I should take some more shots of this pile of aluminum that now looks almost like a plane...




My wife helped to get some shots of the interior with the cowl still on to give you an idea of how much clearance my modification gave me between oil cooler and muffler.




You'll be the judge as to how vital this modification has been. Without the distance I moved this forward, I could have just squeezed a finger between the cooler and the muffler.

Once the cowl was off again, I finished section 48 (Muffler Installation) by filling the springs with RTV. While at it, I also applied some extra RTV between one of the right springs and the water hose to prevent it from getting contact.



Now this had to cure and so I decided to go back inside and escape the 100 degF it had reached in the carport by then.
I cannot find the description for the next step but I know that the screws holding the bowl to the gascolator have to get safety wired. So I will do that next and then install the bottom cowl and leave it on.
The next section is the installation of the engine controls and after that I could install the tank and fire the thing up.

Monday, May 27, 2013

Heat Shield Applied

I was going to apply the heat shield onto the inside of the lower cowl today. My wife had already prepared the template.


As you can see we were going for a 2-piece approach. Let me tell you right now that this did not work out too well, so you might want to read ahead a bit before following my steps.

The templates were put onto the aluminum foil to mark the outlines.


I generously cut out the pieces along the marked lines.


Before I could think about applying them to the cowl I wanted to make sure the exhaust pipe would actually fit through the hole in the cowl. Therefore I needed to attach the muffler that had been removed previously to have easier access to install the oil lines.


At this point I decided to fix an issue with the actuator line that moves the heater door rubing on the lower oil hose.


It just feels better to know that the metal plate could not directly work through the fire sleeve and the oil hose before going through the vinyl hose first.
This thing is pretty much out of sight once the lower cowl is installed and so I wanted to give it some extra protection.

Now I wanted to get the lower cowl on to see if the hole fit the exhaust pipe. However,  getting that cowl on to begin with was anything but easy!


First you have to thread in the pipe while trying not to completely scratch the nose wheel arm, then you can actually get the cowl up and in position.
It didn't fit too well yet!




Obviously, the side and the front of the hole where interfering. I decided to loosen the copper nuts holding the exhaust pipes at this point to allow me to wiggle the exhaust a bit to get a better fit.
That allowed me to put the lower cowl fully in place but still the outboard side needed significant trimming.



I drilled some holes along the line and then used the Dremel to remove the material.



I also marked the pipe for later trimming which should make it easier to put the cowl back on.


Now that I had the muffler in its final position, I removed the cowl and re-torqued the copper nuts, trimmed the exhaust hole in the cowl and continued with the application of the heat shield.
The lower part went on ok but I immediately noticed that the left side piece had to get cut off from the lower piece.


Second part was the little right side piece and then the left piece went on. Some of the trimmings were used to fill some bald spots.


Then I applied the epoxy around the edges to seal the foil in. I also used this batch of epoxy to apply the little notice tag on top of the air tunnel.


That was it. Now I have to think about the best way of cutting that pipe. The room is a bit tight for a pipe cutter but that would certainly make the cleanest cut possible. I'll take some measurements and see what I can find.


Sunday, July 15, 2012

Exhaust Installed

I decided to skip the prop installation for now. I feel that the pitot tube can be installed later and I don't want to pump into the prop and nick it during the ongoing installation of more bulky and/or heavy stuff.
So I jumped ahead to the exhaust installation.

Learning from Dave's experience that he disassembled the exhaust and then had a hard time to determine which part was going where on the engine, I decided to put some stickers on the parts that show the number of the cylinder they should get attached to.

That did indeed help to get the pipes attached to the engine.

Now the muffler was ready to get installed and reconnected to the 4 exhaust pipes, after applying a thin coat of anti-seize to the ball joints.

As I still don't have an assistant mechanic working with me and helping when help is dearly needed, I had to come up with an idea how to temporarily secure the muffler while connecting the springs to hold the thing in place. As I am still not very familiar with safety wire I chose tie-wraps instead.

One tie-wrap on each pipe held the muffler securely in place and gave me two hands to attach those springs. Once one spring was on, I cut the tie-wrap and added the second one.

I installed the EGT temperature sensors (of which I forgot to take a photo) and that concluded section 48. The only oddball was the hole in the exhaust pipes for the sensor is a bit too small. I measured it and then decided to tap the holes with a #30 bit which is exactly the diameter of the EGT probe.
This section took me just 2 hours to complete, so I moved on to continue with the installation of the Cooling System, section 49.

It starts with a real ordeal and I couldn't find a lot of advice in Dave's blog either. The task is to install some springs in rubber cooling hoses.
It is pretty easy to get the springs in up to this point:

After an hour of fighting with pliers, hex sockets and other tools that didn't help, I determined that excessive friction is the main problem in this situation. I decided to grease the inside of the hose and try again to push the spring in with an aluminum tube to give it the 1" setback required.

This chain saw oil is a pretty benign oil that should also come out fairly easy and not harm the rubber in any way.
And, yes, this made all the difference. All of a sudden, positioning the spring inside the hose became a fairly simple task. Washing out the oil thereafter took a while but Dawn did its usual great job and removed most of that oil.

Now the next problem was the length of the spring in the short hose. I cut this to 20" of length as requested and the spring did not allow me to push it to the 1" setback without protruding on the opposite end of the hose. I had to pull out quite a bit of spring and cut it off. Would have been easier had Van's made me aware of this BEFORE inserting it into the hose.

I tried to keep the spring as long as possible that's why you see two pieces in the picture. This is what I had to cut off to come up with a perfect 1" setback on both ends of the hose.

After this major but hard earned victory I decided to complete one more task in this section, installing the heater door.
The materials are much tougher than what I am used to on this door assembly. Most of the parts are made from stainless steel and that sure is more challenging to work with than aluminum.
Cutting the hinge and the pin to length and shape was the first step.


Then the door holes were dimpled and the hinge's back was countersunk, which was pretty hard to do. It is amazing how easy it actually is to counterisnk a hole in aluminum compared to stainless steel.

The door and hinge were riveted together.

And another episode of match-drilling a hinge piece, this time to the outer door frame.

And then finally, it was rivet time. Beware, the holes in the hinge take different rivets than the rest of the frame piece. The hinge wants MSP42 and the rest gets the usual LP4-3.

Then upper and lower brackets get riveted on, with usual LP4-3, and the door gets installed with the help of the hinge pin.

That's when I decided to call it a day to attend some other priorities next to building an airplane.
Expect more installation of the cooling system over the next days...