Friday, August 23, 2013

Seat Belts Installed

And another little step towards completion - the seat belts are in!


Thursday, August 22, 2013

Shoulder Harnesses Installed

I received word today that I should be getting my engraved data plate and the fuel cap some time early next week. I'm really excited and can't wait to see them.

Tonight I did not have a lot of time to work on the plane as I came home late. At least I got to install the shoulder harnesses.


More tomorrow evening.

Friday, June 8, 2012

Stabilator Installed

In the morning I passed my ground part of the BFR, the flying part had already happened and so I'm current again.
Back home I got to work on the stabilator. With the sawhorses and some additional stuff to prop it up enough and a bit of patience the stabilator came on pretty easy.



Some noise next to the driveway caught my attention.


A baby quail following the rest of the crowd and Mommy- I must have disturbed them. The eggs it passed were quail eggs that didn't hatch.
Back to work. Connecting the cables to the horns was actually easy despite the washers that had to get squeezed next to the horn and in between the forks.



Then I took somewhat more than half an hour to put the large cover in place that holds the bulkhead in place when the cables get tensioned. There are really a lot of screws going into this thing!


Now the second turnbuckle went on both sides of the cable ends easily. I tightened them by feel and checked both cables with the tensiometer. It's the blue scale that applies here and the reading is at the 6 o'clock position. Right on 40 lbs. I should mentions here that Van's got back to me about the groove problem. Reality is right and the plans are wrong. They said "they had not gotten around to correct the plans yet" and provided me with a link to VAF where the grooves were discussed before. So is VAF now the official Van's Tech Support forum?


However, taking a close look at the cables and their routes through the belly, I was not happy. Not happy at all! It seems that the further to the front the more the cables want to chafe, at the edges of the holes they are supposed to pass. The upper one is particularly bad and is indeed touch with quite some force and the very front hole. There's no way of adjust anything in that respect so I am a bit at a loss here.



Also, all the cable ends are outside of the turnbuckles more than the three threads Van's was asking for. If I would screw them in deeper, the tension could easily be double the requested amount.



The elevator feel on the stick is nice though. No feeling of sawing the bulkheads in half, no chafing noise or anything. I will ask Van's what they think about this but I sure won't get an answer before Monday. Also if someone here has a comment, please leave a message with your thoughts!
I will have to take the stabilator off again anyway as it is way too big to work around in the carport. The same is probably true for the rudder but only because the entrance is to low to allow the fuselage to get pushed back far enough to have enough room for the engine installation. And I do want to have the firewall inside the carport and not halfway outside in the sun.

A bit frustrated about the results, I resorted to stuff I can control. I riveted some nutplates on the tunnel cover that will hold the flap handle arrestor.


That at least turned out very nice.

Tomorrow I will take the stabilator off again and store it until it gets hauled to the hangar that I will rent starting next month. I believe I might build one of those temporary garages/sun-covers so I can get my truck out of the sun. If there's still time I will start the trim work on the canopy.

Monday, June 4, 2012

Rear Bulkhead Mod Finished

On my way home from work, I picked up some things at HF. Among them a tool cart as I had noticed that I am wasting a lot of time walking back to the shop for getting some missing tool since I moved the plane to the carport. At the end of the evening I clean everything up and the next day I pull everything out again. So I thought a cart might be easier and save me some time in the long run. When I rent a hangar this will then go there to hold the set of tools I intend to keep at the airport.
Most of the evening was spent on assembling the tool cart.


I found half an hour before bed time to match-drill the last nutplate on the backplate of the bulkhead cut out, dimple the holes and rivet all the nutplates on.



I think it turned out great and it is stronger than before.

Tomorrow I plan to match drill the rudder attach plates and install them. Not sure what is next in the plans after that. I might finish the wiring section by installing the OAT probe.

Sunday, May 27, 2012

Floor Panel Modified

Before working on the floor panel I finished the bulkhead back support angle. It needed the nutplate attach holes drilled and dimpled as well as the screw holes dimpled.
I did all put the corner hole which will get a one lug nutplate of which I don't have a sample here, so I have to wait until I get the actual nutplate.

Then I focused on the floor panel. I thought it through for a while and then decided against repositioning the drill markings. Lining up the screw holes would have created clearance issues with the back support and the closest flange.

The little angle you see is one of the tabs of the wing ribs we had to saw off. It has 4 evenly space holes in it and I used it as a drill template and as a stiffener for the back plate.
I separated the panel using the fine hack saw and for about an inch the sole saw blade again.

Drilling the nutplate attach holes and dimpling all the holes in the back plate was up next.

I had 6 of the countersunk K1100-08 nutplates in stock. With this amount I could have riveted the large angle for the bulkhead or the floor panel support. With the one missing nutplate type for the bulkead angle I decided to finish the floor plate as I would not be able to finish the big angle anyway.
So I riveted the three nutplates for the floor panel in.

Then I attached the backplate to the floor panel piece, using AD4-4 rivets.

Here you can see how I applied the angle. The riveted piece is much stiffer than the floor panel itself. I think this modification actually increases the structural stiffness.

This completed the floor plate mod. Outside I was spraying some primer on the bulkhead back support as it has time to dry sufficiently and bond to the metal while I am waiting for my order of nutplates to arrive.

I am running out of work at this point as I am waiting for the servo to finish the avionics installation before I can move the fuselage outside into the carport and continue the gear leg section. One of the few things to do was to install the power supply for the PCAS. After some thinking I decided to install the breaker the install kit came with. I will run the unit off of the GPS/ADSB power supply and I don't want to lose my backup GPS if the PCAS would have a tripping fuse. Here's how the panel looks like now.

Of course I will remove this breaker before certification and just put a matte black sticker over the hole. But at least I can set up as much of the add-on wiring for now and reduce the amount of work after certification. I am not completely done with the hook-up and will finish this tomorrow.
I'm pretty much out of work at this point without having the servo. I could just assume that it really was the culprit but I rather verify that before closing anything up.
Maybe I could look into the cockpit light installation and close section 40. I'm sure I'll find something to do ...

Saturday, May 26, 2012

Rear Bulkhead Cut

The morning started by catching up on the left over from yesterday, riveting the stabilizer tip on.

And then the two pieces got stored away again until the rigging of the control cables.
The next step on the list was to modify the rear bulkhead to allow the tank to be permanently installed. I removed my old markings and applied new ones. The previous ones didn't take the existing screws into account and so the screws didn't line up with the existing ones. After this rather time consuming ordeal I was able to clamp the two back pieces together and see if they had roughly the right size.

As this turned out to be the case, I drilled, deburred, dimpled and riveted the two pieces together.

I clamped the back angle to the bulkhead and ensured that it properly aligned.

Here you can see the drill markings on the front. I used a punch to mark the position for the drill bit.

On to the drill table... Clecoed as I drilled. All the holes are #30s at this point.

All the holes line up perfectly in the back support angle. I must have done something right when calculating the positions of the markings.

I opened up the holes for the screws with a #19 drill bit and unclecoed the parts and deburred all the holes. Then I went on to cut the bulkhead. That's when I noticed that I had no clue if I could actually do it on the bandsaw.
Well, I couldn't! One cut could have been done but only on the wrong side which would have not allowed me to support piece properly during sawing. And this could have caused issues when trying to follow the line or even bent the metal. I decided to go manual on this rather delicate cut.

Why is there a saw blade in the previous picture, you might ask. Well, the hacksaw (sounds gross but the blade is a very fine one, so it's more a surgical tool than a real hacksaw) would only go so far - about 2 and half inches that is. The rest I cut by using a saw blade and my bare fingers to pull it through. I now officially understand the saying that not money nor time are the factors in finishing a homebuilt plane, it's will power.

Almost through. Look closely, the blade is at the last corrugation. At that point I was getting worried that the mechanical forces on the bulkhead that occurred from the violent pulling on the saw blade could bend the cutout just before breaking through. I decided to ply it safe and clamped the pieces together as well as the bulkhead to the work bench.

That made all the difference. With the forces tamed I could focus on finishing a straight cut to the end and the pieces came apart cleanly. I rounded the sharp inner edge in the larger part of the bulkhead and deburred all the edges. I was now able to cleco the back support on and see how much I had to remove from the shorter angle to clear the bulkhead frame. I shortened the piece, deburred the edges again and clecoed it back on to take on last shot.

I decided to dimple the screw holes and use K1100-08 nutplates plus one fancy one with one lug that will go into the corner. The order went out today but until later next week I don't expect to see any parts. I might have some K1100 left but I'm not sure if there are enough to finish the job.
Also I will have to work on the floor plate which I couldn't do today.

Wednesday, May 16, 2012

Ready for Painting the Panel

I came home and started polishing the panel with an SB pad. It took out the slight shine the primer had built up and confirmed that the surface was smooth. I'll be trying to shoot the paint tomorrow morning as we're are going to have a calm morning.
After that I started working on the backplates for the rear bulkhead and the floor panel. A thinner metal sheet I had, got reinforced for the horizontal section of the bulkhead by bending the edges to stiffen it.

I even managed to bend the short side so I could rivet together the vertical and the horizontal support to accomplish even more stiffness.


Then I put the drill and cut lines on the floor panel. The center line will get cut, the line marked #19 will have the holes for the nutplates and the #30 line will have the holes for the rivets. Both outer lines are 3/8" away from the cut line.

Now that I see that the left line is almost in line with the factory screw hole, I might just shift the setup to the left a tiny bit to make it look more in line.
I also drew the lines onto the bulkhead and what I just said also applies to the bulkhead. I think I will shift the lines so they line up with the factory screw holes.

I'm a bit anxious about shooting with a new paint system. Allegedly it is supposed to be easier with Imron. We'll see. The cleanup won't be easier, that's for sure!

Tuesday, May 15, 2012

Panel Primed

I got up at 6am this morning to use the only calm period of the day to shoot the primer. The problem for the next days is that we have a lot of wind and gusts forecast and I don't think that the afternoon would be suitable to do any paint work until Sunday. There will be a lot of dust and other particles stirred up and this wouldn't improve the finish unless I'd opt for some textured paint.
I put the table half way inside the shop so the overspray could get blown out again. This seem to have worked fine again and I was able to close the shop door after about an hour of prep and spray work and the inevitable clean-up. I used a 2K Stewart Epoxy primer in smoke gray which is an off-white light gray. This should be a good contrast for shooting the black paint.

I also added more putty to the GPS mount to finish that.

The primer should cure at least 24 hours and I would like to just lightly sand or polish it, in case it picked up some dirt. So, I'm not sure if I will shoot paint tomorrow morning. Maybe I wait a day or two. It also depends on the wind situation. The primer looks actually so beautiful that I almost wish I could just leave that stuff on and be done.

I've added an evening session in the shop after dinner as I felt restless. The painting part cannot be accelerated and I don't have anything else to do at this point. I was working on some small stuff down the road. The modification of the rear bulkhead to be precise. I laid out the lines that have to get cut but before that I will have to assemble the support that will get riveted to the back of the bulkhead and the floor plate. I will match-drill these before cutting them apart.

I found some nice scrap pieces from the riveting training kit that I had ordered from Van's before I even received the tailcone kit. The bent flanges will make the piece real stiff and keep it light at the same time. I will probably try to bend the flat sheet as well, to reinforce it a bit.

I was too tired to do that tonight, so I ended the session after a short while.

Friday, May 11, 2012

Panel Cut Out

I must not have been all awake when I started building this morning. I was eager to finish the rudder pedal installation by installing those little brackets aft of the tubes the pedals are connected. It all went well, despite the tight quarters.

Despite the Boelube it was quite a challenge to force this screw in with so little room to work. I left the screw a little loose and the installed the two flange screws that were secured with locknuts.

These nuts were even tougher to secure than the screw in the platenut, and I needed all the modified tools I had to get a handle on the nut close to the tube. There's really no room to work in this plane. Wow, what a nice installation, huh? Well, this was just a trial run and it all had to come out again. You might have noticed that there are holes for a nutplate in the flange of this little bracket but there's no nutplate installed, is there? That's why I said I must not have been fully awake when I did that.
Oh my, out it went again. And the nutplates went in.

The second time the screws went in much faster and so after a few minutes I had this, but this time with the nutplate installed.

With the extra experience the upper one went in much easier than I had expected. A lot of Boelube (also on the Nylocks) helped a lot!

With this installed, I now warmed up and fully awake, I carefully approached the panel work. I already had to replace one panel and I didn't want to do this again.
The first step in panel work is to locate the center of each planned for instrument (if it's round that is). I drew a vertical reference on the panel for measurements. As you can see with the angle, the inner edge is not vertical at all. Assuming that the panel base in horizontal, I used the 90 degree angle to draw that reference line.

Then I places the instrument patterns on the panel and determined the horizontal reference that the lowest instrument should touch.

Then I did the match to determine where the centers of the instruments should be located, with a 1/4" separation. I drew these horizontal lines and marked the center spots. Placing the drill jig over it so see if my math was right and everything looked correct.

With the centers verified, I marked the spots with the center punch and drilled the pilot hole in #30. Followed by the step drill to bring the holes to 5/8" for the hole punch. Here you see the hole punch installed for the 3 1/8" cut and the upper one shows the pilot hole for the punch.

I had never done this and you probably neither, so let me tell you that the punch has to crack twice through the aluminum. Once you've heard two distinctive cracks, the punch is through and you can take the thing apart.

Ready for round two. This is how I did it. Put the lower part in a vise and then use 1" wrench to turn the nut. Lots of Boelube on the inside of the punch to ensure a nice smooth edge.

As you can see, this worked out pretty well. I softened the edges by rubbing a maroon SB pad inside the cut out until it felt all smooth.

With the help of the drill jig, the wholes were quickly added.

The PCAS cut out was a little trickier. I first drilled the mounting holes using the panel cover as a drill jig.

I then clecoed the panel cover in place and marked the outer perimeter line that I should not exceed.

The next step was to use the same #30 drill and perforate the outline of the cut out area.

Using the Dremel cutting disc I cut through the perforation, followed by filing the edges smooth and deburring them with the SB wheel.

With a little cleanup and removing the blue protective cover the right panel is now ready for painting.

The last step was to manufacture the covers that will go in place of the instruments until after certification. I used .025" sheet metal from a flaperon skin I messed up. I cut a large piece of out the skin using tin snips and then marked the correct cut outs on the sheet metal and used the band saw for the cut, the SB wheels for the trim to come up with this.

This is the drill jig for the instrument holes. The holes are on the other side.I used a wooden block on the back of the sheet metal and drilled through the jig very slowly and carefully.

One done, two to go. Look how nicely the covers turned out.

And the last one was the rectangular one for the PCAS.

Done!
Now the panels are all ready for priming and painting. I am still waiting for the 2K primer from Stewart, but this won't be a hold up as I won't be building tomorrow. A road trip to Phoenix is on the program for some political grassroots work.

For Liberty!