Fuel Tank Completed

That is about the only positive thing to report about tonight's session. The only thing left was to hook up the fuel sender to the wire that reports to the Dynon. I had done that before running the engine but I had forgotten to explicitly mention it. So I am using this as a straw to clutch on as the rest of the session consisted of taking things apart. A lot of things!
I removed the avionics skin again to tie everything up in there and finish the installation. I also removed the seat pan so I can clean up everything in the forward tunnel as well as finalizing the installation the crotch straps, etc.. I might just leave it open until I get to the airport as it will likely have to be open for certification anyway.
Which reminds me that I really have to call my DAR and discuss the details with him ...


Monday, August 12, 2013

Right Turtle Deck Riveted

I checked the seal for the fuel nozzle flange when I got home from work. This time it was perfect.


No cavities from trapped air or any other flaw. I cleaned the skins and the seal from the wax and re-installed it.


Looked good but I was a bit concerned about the somewhat thick bead of cured ProSeal around the opening. Sure enough the fuel cap would not go all the way into its recess.


So out with it again and I trimmed off the bead with a carpet knife.
The second time it fit much better!



I cleaned up the inside and forgot to attach the wire for the fuel sender to call this section completed.



Instead I finalized the turtle deck skin on the right side now that the tank is installed.



It looks like I am running low on rivets to complete the left side. I will order some more tomorrow as the left skin will soon get finalized too.

I don't know about you but to me this cap seems to be begging for some fuel!


Sunday, August 11, 2013

Tank Installed

It was finally time to put the tank in. Before I could do that, I had to install the aft tunnel cover and the bulkhead edge cover.
As I am closing up an area that necessary to be looked at during the AW inspection, I took a good photo in the hope that this will be sufficient.



That was also the time to reinstall the ELT that had been removed for installing the landing gear reinforcement.


As the rear window will eventually be installed I tried to insert the tank as it would be when the window is in.


Please note that it is advisable to remove the ELT antenna plate before inserting the tank.


So far so good, but how to tighten the fittings for the fuel line and return line hook-ups?
I lifted the tank after lightly attaching the fittings from the belly and put a piece of 2x4 underneath to hold it there. That gave enough room to use two wrenches for the fittings. One to avoid the sealed part on the tank could move and break the seal and the other to tighten the fitting.


Now it was time to create the seal on the fuel nozzle flange to the turtle deck skin.
First I verified that it still aligned correctly.


Knowing how sticky ProSeal was, I decided to apply plenty of masking tape to avoid a mess on the skins. I used carnauba wax as a release agent, inside and out!


Then it was goo-time!


I quickly removed the masking tape.


Not so bad. I could trim the cured ProSeal back a bit but I made a mistake much earlier in the stage when painting the skins. I falsely assumed that the seal would really be larger in diameter than the flange and left a little clearance around it. I think I will let the ProSeal cover this rather than showing bare aluminum. I could always paint the ProSeal later to make it look more streamlined.

It was time to leave the setup alone so it cure correctly.

The next day showed this result:


I was not able to insert the 6th screw the day before and was just hoping it would not make a huge difference.
Thanks to the carnauba wax the screws and the Proseal stains came off easily. I separated the skin and the flange by removing the upper clecos and pulling the skin back carefully.


Looked good - at first. A closer inspection revealed that there were some air pockets in the seal that needed to get filled.


So I gave it another round and this time I could insert all 6 screws. The assembly had to stay undisturbed for another night, so I could not do much more at this time.

Either I was more aware of my surroundings today or it was just a special day but I caught all this right around the shop.




The latter is a king snake and not poisonous. It was rather scared to get so much attention when all it wanted was some fresh pack rat to swallow ...

Next steps: I think it is time to get the fuel system checked for leaks again by filling it up and pumping fuel around. Should this succeed, I am planning to pull the plane out of the car port (nose wheel still on the concrete ramp, prop over concrete), install the canopy and fire the engine up.

Wish me luck!

Wednesday, June 26, 2013

More Vinyl and a Fuel Cap

I caught up with where I had exited section 37, the Fuel Tank section, and happily noticed (but only faintly remembered) that I had completed the leak test on it before. I was then even using a pressure gauge instead of porous balloon and that helped my memory a little bit. The next step before installing the tank in the plane (which will also require the use of ProSeal again which I am not ready for tonight),  was to drill a vent hole in the cap.
For this the cap has to get disassembled which also gives a good idea of how it works when it's put back together. The reason for the disassembly is not that you could right drill through it while it is still in one piece but to be able remove the vast amount of drill chips after you have done so. The ample use of fuel lube on the O-ring does not help that task either, so disassembly is the way to go.

This is how it looks when you are done with this step.



The instructions tell you that the hole in the bottom piece must not align with the hole in the top piece, and they certainly won't as the bottom piece has to be adjusted for proper tightening which requires it do be turned.

After this step and realizing that I was not ready for the tank installation, I went on to removing more vinyl from parts that scattered all around the patio. This time I worked on the wings or better, one wing - the one exposed to the sun.


Watch how little the part in the lower left corner changes (the far outmost part of the right wing):


It happens that this lower spot is being hit by the sun every morning when it rises over the mountain ridge. That was enough to make this piece deteriorate to the point where you cannot pull it off anymore.
I started scraping but it got too dark too quickly to really make significant improvement. More fun with it tomorrow evening.


Monday, June 24, 2013

Fuel Nozzle Modified

When I came home I removed the rest of the vinyl on the tailcone which was uneventful as most of it came right off or needed only a little persuasion.
So I went on to work on the fuel nozzle which I had put away since it was painted. The one thing that I did not like abut the planned installation was that it required the application of ProSeal only to then fiddle with tiny nuts to put on the screws holding the nozzle to the skin. That whole setup is supposed to get tightened only to the point where the sealant oozes out and then builds a seal when cured.
This is already a delicate and messy process and fiddling with those nuts wouldn't make it easier. Also, for future removal, it would require a second person inside the fuselage if the rear window was not supposed to get removed as well.
So, I decided to replace those nuts with nutplates, K1000-06 to be specific. Here's the picture documentation of this well know process.





This should make the ProSeal installation much easier and cleaner (fingers crossed!).

Wednesday, October 12, 2011

Tank Painted

I'm late with updating this entry but the work has been done as anticipated. Yesterday I painted the last parts for the interior, the map box, the fuel neck and the tank.
Despite my troubles in getting a good job done when priming (remember, I produced some small runs), the paint job turned out way better than my previous average work. Actually I think the map box and the tank are my masterpieces with the spray gun.

Take a look at the pieces and note the shiny reflections which prove that the surface is really smooth. Here are the parts right after applying the last coat.




And here after a night of polymerizing in the heated paint booth.


I believe, I am done with painting large interior parts at this point but before tearing down the paint booth I will do an inventory and see if there's nothing hiding in a corner of the shop ...

Sunday, October 9, 2011

Back to Building

Finally! After quite a long hiatus I am back at building. Not with full motivation yet but at least I AM doing something with the plane. Main reason why I am not really gun-ho about it yet is that the still-not-availability of the aviation package is frustrating. I refuse to accept the idea that I would have to crawl back into the tailcone to install the magnetometer thingy and some wires and tubes, lying on my back, resting on two fragile little bulkhead webs. Installing this stuff right now when I can still turn the fuse on its side would be hell of a lot easier and so I am currently hoping (or call it: dreaming) that this aviation package is going to be available before I put the fuse on wheels....

So, I am back at building. What did I do? The tank needed paint and the first step is to prep the aluminum - usually. With the tank there's an earlier step. This is to remove the gunky spillover from sealing the tank with Pro-Seal. This is particularly ugly at the fuel window which I left open (I know I will likely regret this). So I had to find a technique to remove this stuff without damaging the window. Van's calls for building a tool from a wooden spatula with a sharp tip. I did tha but also used a scalpel to cut loose thick chunks before going at them with the wooden tool.


This shows me somewhat into the job (a few holes on the left side have been cleaned up).


This is after being done, also showing the two tools used.

The edges of the tank were trimmed with a loose razor blade. Careful! Don't cut yourself.
Then the tank was up for the usual surface prep and drying in the sun. My painting skills suffered a bit during this hiatus as I didn't show the usual patience putting on the multiple coats and giving the, enough time to dry before the next one was put on. The result? Runs! This is not so bad with this primer as it's to sand. This better not happen during the paint run!!!
BTW: The window holes can be covered with self adhesive felt patches. The diameter should be 3/8" which makes them fit perfectly in the holes.







I only primed the left and right side (the right more accidentally than willingly, call it a mistake), the top and the front of the tank. Only these sides will be exposed and there's no need for paint on the other sides. This way the tank will be paintable in one long run instead of needing multiple days to be able to put it on a previously painted side.

The primer should fully dry over night and then tomorrow I will probably sand and paint.

I also primed the fuel neck and the map box.



Tuesday, August 16, 2011

Houston, we are leak-free!

I finally took a plunge testing the fuel tank for leaks. I was very afraid of a negative result as I felt overwhelmed by just thinking about taking this gooped up box apart and doing this all over again. I seriously thought about selling the project in case the tank turned out to be leaky.
Well, I don't have to worry about it for now as it turned out to be totally gas tight, I used a more sensitive pressure gauge for that test as Van's was warning about testing the tank with pressures beyond 1 psi. I tested it with 8 inches of water, which is about a 1/3 psi. It actually later turned out that the tank was so gas tight that the pressure rose up to 12" as I had filled it with cool air from the shop A/C and the system warmed up over night and therefore increased the pressure.
Initially the tank leaked somewhat but it turned out to be leaking around the fuel neck flange and the Moeller gauge hole which I had covered up with a plate. After tightening the screws on these flanges the tank did not lose any air in 12 hours.


I hooked up the pressure gauge to the fuel outlet of the tank and plugged the return line inlet. The rest as per plans in addition to covering the hole for the Moeller gauge.

Monday, July 11, 2011

Fuel Tank Closed Up

Today was the day. Let's just hope I don't have to do this again!



Two things I did, deviating from the plans, I should mention. First, the order of the final assembly.
I had the front plate uninstalled when getting to this final step. First I riveted the clips to the top, gooping them up as necessary.
Then I put a thick layer of sealant in the corners to seal off the top when it comes on. Use a finger to spread it well but leave it thick, don't spread it out too much. Don't forget to put lots of goop on the inside where the tank has this little bent. The cutouts in that bend have to be well covered with sealant.
Then I installed the top skin. Don't worry about the clips just yet. Focus on aligning the skin without losing too much of the goop. Once sparsely clecoed, reach inside the tank through the front plate and snap the clips onto the return line. Mine felt a little loose so I added a cherry sized amount of sealant to them. Just goop it on a finger and feel your way with one of the clean ones.
After riveting the top skin on, I riveted the filler neck on, then finally going for the front plate and then installing the fuel sender.
This all took exactly two hours after mixing which happens to be the pot life of my Chemseal stuff.

The second thing I changed is quite obvious in the picture. It's the added ground wire, directly attached to one of the screws that holds the sender in place. I felt that with multiple layers of ProSeal the ground would have a hard time getting propagated over those plates. Installing a wire is much simpler and more reliable. I will run the other end to the forward inboard mounting screw.

Wednesday, July 6, 2011

Monsoons Stopped Building

The last two days I came home to find that the electricity had been cut off and they didn't repair it until late in the night. So, no light in the shop, no A/C, no internet. I didn't get to start the last chapter on the fuel tank therefore and it might not be the last chapter anyway if I find a leak.
Let's hope those monsoons decide to dump their load in another part of town for the next days so I get to finish this task.

Sunday, July 3, 2011

Fuel Tank Ready for Final Step

The last few days I was on and off working on the plane, mostly in the shop. It wasn't really worth posting every little step of progress so I am summarizing the last days in one post today.

On Thursday, I manufactured the clips that will hold the fuel return line to the top skin of the tank. It would have been an easy job had Van's provided the material. I thought I had seen a strip of aluminum for this purpose but as much as I was browsing and searching the list of contents for the bags, I could not find it. A part that small must be either in the bags or was a leftover from a larger part where most of it was used elsewhere, alas I could not remember where I would have put such a left over. Either way, I had no material and studying the drawing I thought I scrounge up some skin pieces from the scrap bin. I did so and cut and bent the piece to shape and created some beautiful clamps - only to find that I had overlooked the material thickness laid out in the drawing. It said .032 and I had used ordinary .025 from a skin. So back to the scrap bin and retrieving some .032 parts this time. This is a rare good but after a while I found a suitable piece and went through the manufacturing process once again.


Then I manufactured the return line inside the tank. I cut the tube to length, allowing for a lot of excess material (final cut can happen once installed). Flaring one end was simple and I installed it on the fitting. Making those bends inside the tank was not really hard to do and it helped determining the correct position for the bend by eye-balling the height from the side of the tank.
After the first bend I put on the top skin with a few clecos to determine where I had to make the upward bend to guide the line into the filler tube.



I marked the position this time (pretty close to the cutout as the bend takes a half the diameter of the opening), removed the skin and bent the tube. Then I put the skin back on and also put the flange in position to determine how much of the tube I had to cut off.


I cut off the tube and deburred the end, then removed the top skin.



That was the result of Thursday. I had also tried to rivet in the ring for the Moeller gauge but this attempt failed miserably. It turned out that I had no good flat surface that was also strong enough to not dent when hammered and allow the skin to rest evenly at the same time. I ordered a steel plate at Amazon to try again.

The steel plate arrived on Saturday and that's when I went back at it. With a little effort I was able to get those countersunk rivets set without pushing them out in the process. I held the nutplates in place with their respective screw after alliging the rivet holes with clecos.


As the final installation will be done with Pro-Seal it doesn't matter if the rivets are really completely flat with the surface.
This is how the inside of the tank will look like.


On Sunday, today, I finished the tank work by pre-installing the fuel sender and scuffing up the flanges that will get prosealed and riveted next. Bending the steel wire to plans was easy with a vice and a hammer - but, hey, I have a lot of experience since the flaperons when it comes to banging the cr*p out metal!




That done, I had to verify that the sender arm wouldn't contact the cross baffle, so I installed the sender for a trial fit.



As you can see the baffle was not an issue. I could easily put my finger in between the baffle and the wire without lifting the floater. I also measured the arm movement and I came quite close to the values listed in the instructions. In lowest positions the top of the floater is 1 5/8" above the tank bottom. At the highest position this measures 10 3/4", 1/2" more than in the instructions.

Then I went on and made two candles as Dave called them. If you're unfamiliar with Dave's recent blog entry, he was talking about the flaperon push tubes.
After cutting, deburring and truing the cut of the tubes, I marked the center of the holes to drill with blue tape. I have some aluminum brackets to hold pipes in a vise which came in very handy now.


I drilled the hole through the tube so it exited in the other side to reduce the number of alignments (and curses) I had to do. To make sure that the second set of holes would be close to be "evenly spaced" with the first set, I used this little trick (look at the head of the bolt):


The result looked like this.


I prepped and primed the parts and riveted them together (make sure mark them before taking them apart so you know which stub goes into which end of which tube!) and adjusted them for correct length.


The tank is now ready to get its finally internal cleaning and then I can goop the parts together and pray that the pressure test after it fully cured will show that it is indeed not leaking. I might be doing this tomorrow morning ...