Showing posts with label Section 14. Show all posts
Showing posts with label Section 14. Show all posts

Sunday, September 26, 2010

Section 14 Done

Today was meant to be a short day. I started picking things up where I left them the night before. The flaperon hinges. I was very careful about aligning them correctly with a little bit of inward tension to keep them in contact after riveting. It turned out to be quite a nice riveting job.



More importantly though, the hinge flanges didn't separate from the inner part and the bearing didn't seize either!

Then these hinges got riveted to the doublers and those then got riveted to the rear spar. Here's a photo of one side, including the outer flange bracket attached to the opposite rear spar.



and here's the other side:



And that was the end of Section 14. Believe it or not, once you get over the time consuming countersinking part it rivets away pretty quickly. Over all, including the priming job, I spent 21 hours on this section.

And while I was preparing the next section, my wife caught me unwrapping a new set of "toys", as she calls it.



Do you want to know what I was thinking about while I unpacked this one package of nose ribs?
Yeah?
It was: "Do I really want to scrub and prime all these?" ...

Saturday, September 25, 2010

Priming Done, Riveting Started

It took me another day until I could get to prime the parts of Section 14. Work was crazy and the air still humid, so I didn't want to carve out day time to do this.
So today in the morning I started the priming and all went well. I also did not forget to stack up all prepped parts and weigh them before and after the priming. The stack of weighable parts (everything but the rear spars) came out at 1411 grams (yes, grams! I don't see why you should come up with fractions of an ounce when there is a unit that has a reasonable resolution to so the job).

All this came out at 1411 grams:



After two hours the parts looked like this and formerly weighed 1411 grams was now at 1436 grams, a difference of 25 grams ( yes, I waited a few hours to let the parts dry before weighing them) or 0.882 ounces or a little less than 23/256th of an ounce.



So, the weight increase was about 1.77%. While this is particular to the combination of these parts as the weight increase is certainly a function of surface area (which I was too lazy to calculate), on average this should be a reasonable number for basic parts that are not skins or ribs (as these have a low weight but a huge surface area).
If I would apply the 1.77% to the advertised empty weight of the finished product of 740lbs, I get 753lbs primed. I think I saw 755lbs reported on the Van's Airforce Forum for one that was completely primed on the inside. So, I assume this is a good figure for the estimate.

After the primer had fully dried, I started the fun part of this section and went on to assemble the hinges.



This is how they looked after priming. Now, I remembered from the early beginning in May when assembling the hinges for the rudder that the COM3-5 bearings are very sensitive to primer dust inside their milled seating area. So, I went ahead and scraped the inside of the hinge flanges clean of primer.



I also remembered to bent both flanges a bit towards the inside so they would open up and leaving an ugly gap when riveted.
Then I noticed that I haven't been riveting delicate parts like hinges for quite some time so I figured it'd be best to get some squeezing practice on something else that's not so unforgiving. The flaperon hinge brackets seemed to be a good candidate for that and sure enough it turned out to be a nice practice.



The I decided to increase the challenge a little by riveting the doublers onto the nose stub spar. This included riveting countersunk rivets in doubly countersunk holes in order to get both sides flush. I felt the suggested rivet AD3-3 was a bit too short to really provide enough area in contact once it was seated. I tried a 3.5 that sure enough was a bit too high when the squeezer applied all the force it could but it was filling the holes much better. I decided to use a punch and a sledge hammer to set rivet deeper and using the concrete floor of the workshop as an anvil turned out to be an excellent job. I used 3.5 rivets on the other spar doubler inboard are exclusively.



Oops, that was the pretty part. Here's the inside:



The primer suffered a bit but the surface across the rivet is now completely smooth AND the shop head fills the countersunk hole completely.

Well, finally that all left me with not enough to really start on the hinges but I at least clecoed them and fine adjusted them for proper alignment. It is probably a good idea anyway to start riveting a delicate part like in the morning...

Thursday, September 23, 2010

Prepping Done

No photos today, but I got done with all the prep work with Cortec VpCI-440. 3.5 hrs of scrubbing and washing off aluminum. I'm done for today.
Before I prime this time I want to precisely weigh the parts and see how much the primer is increasing the weight. I hope I don't forget doing it!
This section is almost ready for the last chapter as I am getting close to riveting now.

Wednesday, September 22, 2010

Ready for Prep-n-Prime

I was transitioning to night shift again and had the whole day to deburr edges and holes and countersink a few holes and get every part of Section 14 ready for prepping and priming. Sure enough it was raining today and the humidity was high, so no chance to get an early start on shooting primer. I took easy and focused on doing a good job on the deburring instead.
The only odd step in dealing with the hinge brackets was that they are supposed to get countersunk on both side of the same hole, which I assume to mean that the manufactured head will have to fill the countersunk area and that the rivet is supposed to not protrude beyond either side's surface.



After about 4 hours I was done with deburring and had created a nice little stack of parts that need some primer on them:



And the rear spars got finished too



Tomorrow I hope to get at least the prepping done.

Tuesday, September 21, 2010

Spar Stubs Countersunk

With the previously described new method it took me about an hour to finish countersinking the other spar stub and everything went extremely well. No vibrations or anything else messing up the holes., So went on and deburred those spars as well, getting them ready for the upcoming priming frenzy.
The blank parts are ready for prep and prime, the vinyl covered ones are yet to be processed.

Sunday, September 19, 2010

Countersinking Spree

I was so enthusiastic about completing Section 13 so quickly that I somehow expected this to continue just like that. Well, I had an awakening of some kind right in step 2 or 3 on page 14-01.

One of the reasons I couldn't start as early as I wanted on section 14 was this:



This beautiful bobcat was sitting right next to the shop entrance and wanted to take a nap, so I backed off and let her be. I love cats and wild ones even more, so I wouldn't do anything to make them feel anything but welcome....
Half an hour later she found a better spot and was gone, so back to work.

The job was to countersink (120 deg!) the outer side of the leading edge reinforcements that later get attached to the inboard side of the nose ribs. The skins in that area will get riveted on with CS4 rivets. Why that is I'm not quite sure as all the other skin rivets have a domed head. How this is going to be smooth I don't understand either as the holes in the skins are not going to get dimpled except for two on the outboard side of the skins. You see all that later in section 15. I can just assume that the particular way they want you to countersink this part (a bit deeper than you usually would) means that the force of setting the rivet will also do the dimpling and force the skin to bend enough to seat the rivet flush with the skin.
But that's in the future! For now, I had to figure out how to actually do the countersinking on a piece that cannot be sit flat on a surface to work on. The flange of this front spar is bent to match the curve of the skin in this area. I tried first to use my trusted electric screwdriver that I used before with success on parts that are flat. This worked OK until my arm got tired and I had a hard time to hold it perpendicular to the surface (that flange area is very small). I hadn't even finished the 28 holes on one flange when that happened so I had to think of something else.
I laid the flange flat on the edge of the workbench and moved the hole to work on just beyond the corner of the bench. Now I could press down straight and work as usual while my weak hand was holding the flange in place. The spar material is thick enough to withstand the force without bending or flexing. After doing about 3 or 4 of the holes with this method I thought that if I could just find a support with sharp and straight edges I could do this on the drill press and safe myself a lot of muscle pain. After all, the number of holes to complete this task is 112.
I found a V2A steel cube that with some extra support had a reasonable height to give the web of the spar enough clearance on the drill press platform and I tried it with good success. For a reason that I still don't understand, the countersink cage sometimes starts vibrating in the hole and then creates a larger countersink than what it was set to. This happened twice while using the drill press and it is announced by a sound of screeching metal. All you have to do then is to stop, apply a drop of Boelube on the hole and continue carefully. Unfortunately, I learned this after messing up two holes and sinking them too deep. Not too much to throw the part away but enough to be unhappy with the job, so safe yourself the grief and be careful.
After I found out how to use the drill press in this step, I was making a lot of progress and finished the second flange in record time and without tiring my muscles.

This is the result of 3.5 hrs of countersinking and trying different ways doing it.



Here's a photo of the final setup:





Tomorrow evening I'll try to do it to the second spar.