Showing posts with label Section 15. Show all posts
Showing posts with label Section 15. Show all posts

Friday, November 26, 2010

Finished Section 15

After the cold morning had been warmed up by a sun shining from a beautiful blue sky, I set up the priming job. 12 nose ribs had to get shot and I knew with those low temperatures the drying process would take much longer than usual. Despite the wait the job was done within 2.5 hours and the ribs were put in the sun for deeper drying.


After about 2 hours of "tanning" in the sun I riveted the ribs to the wing. I also riveted the stub spar onto the nose ribs, so that the wing is practically ready for the skins - if only they were ready.



So now I'll have to get the bottom skins ready. More scrubbing and priming ahead!
But Section 15 is done. Overall time for this one was 50 hours.

Thursday, November 25, 2010

Right Rear Spar Riveted

Besides finishing prepping the last 2 nose ribs I also clecoed, match drilled and riveted the rear spar of the right wing. Then I had to go back inside and help my wife with the Thanksgiving cooking. But there wasn't anything else to do before priming the nose ribs anyway. That will be the job for tomorrow.


Wednesday, November 24, 2010

And another 6 down!

Another 6 nose ribs that is. We got off early today and so I used the extra time and the warmer temperatures during the afternoon to scrub 6 more nose ribs with Cortec-440. 2 more to go which I will probably do right before priming.

Tuesday, November 23, 2010

Scrubbing Away... Again

In the cooler temperature it's not that much fun anymore to do some prep work on the ribs during the evening but it doesn't help complaining either. The work has to be done. I got 4 nose ribs done tonight and 8 more to go before I could prime them. I guess I should be able to do 4 more tomorrow and then 4 on the day when I prime before setting up gear.

Sunday, November 21, 2010

Right Wing Started...

... or Back to Section 15. Whichever you like more as the title for the second chapter of todays work.
I couldn't help myself! It seems I am over this nasty stomach bug and full of energy after this week of an unwanted break. And with all that vacated space now that the left wing was moved to the cradle, I just had to get started on the right wing.
This time, knowing what I was supposed to do it went even faster. 2 hours and the main ribs were riveted to the main spar.


Not much more to say, I guess. I can see how I will be held up by those not yet primed nose ribs though. Oh well, Thanksgiving Weekend is coming up ;-).

Sunday, October 24, 2010

Left Bottom Skins Primed

Four hours of priming work turned that huge stack of silvery aluminum into matte green. That included wiping off the bare skins with acetone to get rid of any left over contaminants.



I didn't just prime the skins but also the stack of main ribs for the right wing and some small parts.


After final inspection it turns out that I must have missed a spot on the W-1202L skin which is the one that overlaps the inboard and outboard skins and therefore goes on last. I should have enough work for this week's evenings that this will not slow me down. So I assume that I will fix this little problem next weekend when I shoot more primer, probably on the nose ribs for the right wing.
To be able to work on the left wing during the evenings without any help I had to turn the wing over and get the bottom up. My wife helped me turn this thing over.

Wednesday, October 20, 2010

Scrubbing Along...

The last two days I was coming home from the day job and preparing the next stack of ribs for priming by scrubbing them with Cortec 440. There's really not a lot to report about that and I'm sure you're already grown tired of photos of different stacks of aluminum piling up. So here's one from the actual activity.


It's a real boring job and so I try to do 6 ribs a night, hoping that this way my mind is not overly numbed by this activity but yet enough to build a nice stack for the priming during day time on the weekend.
I just realized that preparing the ribs for the right wng is not the right thing to do as I want to finish the left one first, so after I finished my ribs for the night, I did some prep work on the skins for the left wing. Mainly sorting and organizing so I have easy access to the skins when I need them.

Saturday, October 16, 2010

Left Wing Skeleton Done

That was a long day today. I started at 11 am with cleaning the prepped ribs by wiping them with Acetone. There's always some residue on them that I want to get off. The primer sticks much better on clean aluminum.
Then I went on shooting the primer on 14 ribs. That went pretty quickly with the big gun but I needed some time detailing to really be happy with the result. Because of the large amount of ribs I had to utilize my trucks' hood as a drying rack.


That way I could shoot the next stack while the previous one was drying on one side. I think that was the main reason why the process went fairly fast.

After some time cleaning up and getting the paint out of the gun in which the primer had some time to settle, I went on to prepare the fun of the day: riveting those ribs to the spar!



I followed the plans, started outboard and worked my way inboards - rib by rib. This way I had enough room to rivet the ribs with the manufactured head on the ribs as they asked to do.


Here the outboard 5 are done.

When getting further inboard the ribs have to be riveted to the flange angle as well as to the spar. These ribs then have a rear flange. When I riveted those I first riveted the upper and lower hole through the ribs web into the spar angle. Then I riveted one of the rear flange holes and then the web hole right in front of that. That way I had always enough room to get the P26A riveter lined up and didn't have to use a wedge tool.



Getting the inboard 4 ribs riveted was a pain. The spacing is so narrow that I could hardly get the riveter in there to do the job. This got real bad when the one -L rib (second from inboard) was riveted. This one goes in opposite to the other ribs which mean that then I had to rivet from the right. But on that side was already a rib installed, so I had to bend that one out of the way to be able to open the handles of the P26A. It's awkward but it worked without damaging anything.

After 3.5 hours of riveting I had this:



Just because I mentioned the time... so far I have been working more than 37 hours on the wing kit.

Friday, October 15, 2010

Finished Rib Prep Work for Left Wing

Just a short note... I finished the prep work on the ribs for the left wing tonight. Now I have a matte silver stack of ribs sitting in the workshop waiting to get wiped off with Acetone and get primed. There are 13 nose ribs plus the one hinge holding rib of the right wing and its bracket doubler.
Sounds like another busy weekend...

Thursday, October 14, 2010

A Little Prep Work

The weekend is coming and I am getting ready for another primer-shooting session. As the days got rather short now in Southern Arizona, working during the week became less enjoyable as I have to use shop lights to light the working area if I can't do the job inside the workshop. This is certainly the case with the prep work as I don't want to deal with water and strong bases inside.
I found a workable arrangement putting the light far enough away so the bugs wouldn't bother me while still providing enough light on the part I'm working on.
Here's the stack of nose ribs for the left wing, plus one drilled rib for the right wing with its hinge bracket doubler. I do this in matching pairs so I don't mix them up when I remove the markings during the prepping and priming. After the primer dried they will get marked again so I know which bracket was used to drill which main rib. That way they should go together perfectly.


After two hours of scrubbing and rinsing I got 6 nose ribs done. Here are four hanging on the drying rack.


Van's has already sent the replacement main ribs that I had ordered late last week. I quickly deburred those two main ribs and re-completed the stack of main ribs that shouldn't get any modification. So the ribs for the right wing are also ready to go through the priming process. Pretty good timing as this will come next after I put the nose ribs on the left wing.
That is if I don't deviate from the plans that would like me to build both wing skeletons first before starting the skinning process. I think I don't have the room to store the relatively fragile skeleton of an unskinned wing while working on the other. At least not safely. So I think about completing one wing before starting to work on the other one.
I'll decide that when I can see how wobbly the skeleton is. If it is sturdy enough to sit in the wing cradle I can stick to the plans.

Sunday, October 10, 2010

Main RIbs Riveted to Left Spar

With the efforts the of the last two days everything was ready to start on the left spar. Before I wanted to do that I wanted to catch up with a few left out tasks from the previous pages and get these out of the way. They consisted of riveting nutplates to 3 nose ribs and riveting the doublers to the front of two main ribs. That didn't take long - including one drill out procedure because of slipping off a rivet in the wrong moment. No harm done.


So here I was, rearranging the work area in expectation of the Fuse kit delivery tomorrow afternoon. Main goal: Getting the spar as close to the workshop as possible to ensure short ways when getting needed tools.


Here we go, ready to attach some ribs! Despite the manual telling me to cleco and rivet rib by rib (or at least that's what I translated from Oregonian), I decided to cleco all the ribs first before starting riveting.



Notice that the inboard rib is mounted with its rib double on the outboard side of the flange although this doesn't look right as the doubler will get bent in the riveting process. Van's and some blogs confirmed this is the way to go.


All ribs clecoed, ready to insert the rivets and start my favorite part! After about an hour of fun - well, partly as you either have to fiddle with the wedge tool or use the manual tight spaces riveter in between the inner ribs and on the rivets next to the spar bracket flange - it looked like this:



This went so well and there was still some energy left in me that I decided to go and add the rear spar as well. Besides, the whole structure is quite wobbly before you attach the rear spar and I didn't want to get anything damaged when I run into it at night.
The rear spar attachment requires some match drilling on the inboard rib. So on it goes for drilling...


... and off it comes for deburring and cleaning away the chips. Then it goes on again and the riveting starts. I don't want to bore you with the details, so here's the end result.


Make sure that you use LP4-4 on all four holes on the inboard rib, the one you match drilled before.



And that was the end for today! Nice looking wing that is... So, now the nose ribs have to get some prep 'n' prime treatment and then the left wing skeleton would be done.

Saturday, October 9, 2010

Left Wing Ribs Primed

Despite the beautiful day today, I kept on pushing through with my rib prepping and priming and finished the complete set of ribs for the left wing and a few more that are needed for the right one. I think I counted 16 ribs on the drying stack.


Riveting of the main ribs to the left spar can begin now! A brief summary of the hours spent on section 15 showed around 23 hours.

Tomorrow morning I will drive out to the field though and see if I can get a nice relaxing sightseeing flight done. Destination is the Baboquivari Peak and then maybe a stop in Sells on the way back.

Oh, I almost forgot... Van's sent me a letter announcing the arrival of the Fuse kit, minus an F-1231A-AR, which seems to translate into a "Roll Bar Frame". They said it was on backorder... huh? BACKORDER? I thought they manufacture all that metal stuff themselves??? How could it be on backorder then? Hm, we'll see how that plays out, for now I'm busy with the wings anyway and it sure seems to take a while to finish them. In the meanwhile I will have to find some smart storage for this Fuse kit crate again as I don't have the slightest clue right now where I could put it ...

Friday, October 8, 2010

Finally, a Setback

I finished what I believe to be the last match drilling of section 15 before the major riveting session is going to start. This was for four main ribs that needed to be match drilled with the hinge assembly (flaperon) and some additional doubler bracket. Nothing exciting here, just cleco as you go after each hole and spread the holes you drill in a random pattern to ensure that there's no tension introduced to the structure.
After I had made sure that there wasn't more drilling required on the following two pages, I started collecting the ribs that should be primed first to finish some left out steps, like riveting nutplates to them and such. That's when I realized something weird. I had a stack of -L main ribs put away as they were not to be trimmed and supposed to be left alone. 7 of them to be exact. Well, when I looked at them it appeared that one rib wasn't quite right on that stack....
A closer look revealed that it was a -R instead of a -L and quickly counting them confirmed that I must have messed this up. Only 6 -L were on the stack untouched and one untouched -R. Ouch! I thought I had made absolutely sure that this wouldn't happen but somehow - and I can't even image when and how - I must have messed this up. All the -R main ribs are supposed to get trimmed the forward flange off. That was easy to fix but that still left me with one untouched -L main rib short and I can't glue the trimmed off flange back on!
Aw, well, that was expected to happen sooner or later and I am glad it happened later than I thought. I went back inside and checked the Van's website for the shocking price of a W-1210-L and was pleasantly surprised to find it to be less than $17. The pleasant part of the surprise will soon be forgotten when I see the shipping charges applied to this relatively odd shaped shipment, I am sure. I ordered two ribs as I had nicked one a little during speed deburring with the 6" Scotchbrite wheel and this was a good chance to fix that problem as well.
To get over this little setback, I decided to ignore it and move on with the show. Prepping was the labor of the day and that's what I did. I chose the ribs that need further processing like nutplate attachments to go first into the prepping queue. Then follow the -R main ribs (which are supposed to get riveted on the LEFT spar, God knows why) and they are the ones used next in the assembly.



All in all I got 12 ribs prepped today. There are only 11 in this picture as the 12th was still hanging outside to dry.
The plan is to paint them early tomorrow and let them dry during the day while I go flying and then work on the nose ribs that needed some more processing done in the evening. And hopefully I can get all the necessary main ribs prepped and primed on Sunday so I can start riveting them onto the left spar during the week. Doing a little riveting after work in the evening is easy to do compared to prep work that is kind of messy and only worth the setup and cleaning time if you actually have enough time and daylight to go through a little stack of parts at least.

Wednesday, October 6, 2010

Deburring of Ribs Done

A short two hours in the shop finished the deburring task tonight. It would have been much faster if I hadn't found the stack of unmodified left main ribs that I had put away to not accidentally trim them. That action had also put them out of my sight for the deburring though, so I had to finish them as well.
So, now I can finally head on to the prepping job and scrub them all. Jeez!
Well, I am thinking about flying up to the Grand Canyon taking Friday off to have a full day there before returning on Sunday. That might give me a nice break and keep me away from the prepping for this weekend. If you're close to Valle, AZ where I intend to stay over night, drop me a line and we could have a beer up there...

Tuesday, October 5, 2010

Finished Edge Deburring on RIbs

Wow, another couple of hours spent on deburring tonight and I finished doing this at least to the edges of the main ribs. As they are pretty straight I found another good way of doing this with my 6" Scotchbrite wheel. It's not as surgical as the little 1" wheel in the die grinder but a lot faster and less exhausting to use. The inside of the right main ribs needed some treatment that couldn't be done with the big wheel though, so it was back to the die grinder again.



At least the majority of the job was done with the big wheel in almost no time, so it wasn't that bad at all. So now all that is left to do before I can enjoy scrubbing all these ribs with Cortec-440 is to deburr the flange holes of these ribs but that shouldn't take more than an hour and I probably do that tomorrow evening.

BTW, I used up quite some 1" Scotchbrite wheels on just the ribs as the edges were so sharp they sometimes just cut a slice of the wheel right off. A real "cheap" source for these 1" wheels is Reid Supply. They have the fine 1" wheel for $2.40 at this time while others charge $6.50. The item number for this wheel is 3M-13713. I also tried to work with the slightly harder medium compound wheel but I couldn't effectively use it in the die grinder as it tends to jump.

Sunday, October 3, 2010

Straightened the Cuts

I had second sessions later this afternoon and spent half an hour to straighten those rough cuts that the nibbler left on the forward edge of the main ribs.

Here's a before-after shot of how the cut looked before and after I trimmed it with the Cut & Polish and the Scotchbrite Wheel.



Another thing I noticed when dealing with the main ribs is the lack of distinction between the -L and the -R version of the ribs. The only way to quickly tell which one is which once the stickers are gone are the location of two holes in the web.

One is in the forward part of the rib:



And one is in the aft area:


So, in case you removed the stickers and thought the ribs were all the same and found out later that you have no clue which is which, look closely at these photos. The left rib in the picture is the -L and the right one is the -R version.

Still Trimming Along ...

Puh, this is really taking a while. I finished deburring the holes of all the nose ribs, I got even that far to almost install some nutplates before I realized that I will have to wait with the riveting until I have primed the ribs.
So I went on and started trimming more flanges off the main ribs. After doing this on 19 ribs I didn't go that far to also straighten and deburr the cut.
Actually, If you haven't started working on these ribs yet, you'll be surprised on how many you will have to remove material. My workshop is somewhat limited in available tools, and I came up with an OK solution to accomplish these trimmings in a reasonable amount of time. I used the HF pneumatic nibbler to remove most of the material. The edges of the cuts are pretty rough and my 3M Cut & Polish wheel trimmed the rest of these edges and made them smooth enough to deburr them with the Scotchbrite wheel thereafter. It's a 3-step process but fairly fast and easy on the polish wheels.
If you have a bandsaw you could use that very well on the aft flanges of the nose ribs and the nose flanges on the main ribs, probably reducing the process time quite a bit.

The next steps are to straighten the cuts on the main ribs and deburr all 26 of them. I might have to spend all week on this ...
But there's another package from Van's on its way. So maybe I can interrupt the routine by doing some inventory again!

Yay!

If you didn't notice it.... The enthusiasm was fake :-)

Saturday, October 2, 2010

Nose Rib Edges Deburred

It took me a while to come up with a positive sounding headline, so please give it a moment and silently appreciate it.
The nose ribs seem to have been deburred - on their edges. That means I have to go through the stacks again and do the holes but then I should be finally done with them.

Here's a pic of the stacks on one of my workbenches:



The one on the far left is the stack with the nose ribs for the left wing, the one to the far right is the one with the nose ribs for the right wing and then we have the two stacks in the middle. These are the main ribs for both wings and I haven't done anything with them yet.

It took me about 6-7 hours to do the deburring, trimming and fluting of the nose ribs for both wings so far.

Thursday, September 30, 2010

Deburring...

My start on section 15 is slow - very slow. First I was put off by the idea of having to start the deburring of the nose ribs before I could do anything and there are 28 of them.
Then when I started to bite the bullet and start the deburring I noticed that the edges of these ribs are really rough and they are eating up my little 1" Scotchbrite wheels in no time.
Well, finally, I found back to my helpful stoicism and I stopped thinking about all this. I finished 6 ribs in about an hour of mind-numbing deburring work, so I predict that in about 3 more hours I should be through the stack of nose ribs.
A bit later there will be 26 main ribs, but I try not to think about that!