Showing posts with label Finish Kit. Show all posts
Showing posts with label Finish Kit. Show all posts

Sunday, September 1, 2013

Fuel Gauge Retro-Fitted

The latest modification from Van's is they have removed the sight glass for optical fuel level control and replaced it with a Moeller fuel gauge that others had installed after certification some years ago. Everyone who did this had only good things to report from this modification and the great advantage is that this gauge can be read during flight as well as during refueling.
Van's did not just modify the current kits to include this gauge but also added a Section 37A for allowing us earlier builders to retro fit the gauge and optionally close up the sight window if it was leaking.
Well, mine was not leaking (or not yet), so I followed Van's recommendation and left the window alone for now. I did want to install the gauge though.
Before getting into smelly fuel sealant again, I took a short detour by removing the Dynon backup battery for the SkyView. This battery had never been able to complete the battery test required by Dynon and shuts off the SV display after around 40 minutes. I talked to Dynon service and they asked me to send it in.


The battery is on its way to Washington state at this time. Due to the Labor Day weekend I don't expect it back before next weekend. Maybe Dynon can surprise me for a change...

On with the fuel gauge installation. The necessary hole was already drilled from the fuel tank construction and only temporarily covered with a sealed plate that had to get removed now. Look for the screwdriver standing in one of the screws of the plate in the following picture.


That plate was quickly removed and I continued by taping off that area that was about to get prosealed.


I polished the area with a ScotchBrite pad and cleaned it with acetone. I pumped out the left over gas from the last engine run and was left with the problem of how to dry out the tank enough to get the ProSeal to cure fully.
I decided to reuse the air regulator I had used for purging the oil system a few weeks ago and blow a continuous stream air into the tank and let it vent through the fill nozzle.


After an hour of venting it the fuel smell was down to only a hint and I decided this was good enough to get the sealing process started. First I tried the gauge without sealant to see if everything still aligned.


It did and we were ready to mix up the goop! Notice that the paint was sprayed using the rubber seal as a guide which left about a quarter of an inch around the gauge. This will have to get painted when the ProSeal has cured.


I think I mixed up way too much of that stuff as I had a hard time to smoothening it out.


I left it sitting like this to give it time to fully cure before removing the masking tape.

The next day I removed the tape and the result was looking good.


Once the ProSeal is fully cured I will carefully apply some paint over it and try to make it look a bit nicer.

Friday, August 23, 2013

Seat Belts Installed

And another little step towards completion - the seat belts are in!


Thursday, August 22, 2013

Shoulder Harnesses Installed

I received word today that I should be getting my engraved data plate and the fuel cap some time early next week. I'm really excited and can't wait to see them.

Tonight I did not have a lot of time to work on the plane as I came home late. At least I got to install the shoulder harnesses.


More tomorrow evening.

Monday, August 19, 2013

Fuel Tank Completed

That is about the only positive thing to report about tonight's session. The only thing left was to hook up the fuel sender to the wire that reports to the Dynon. I had done that before running the engine but I had forgotten to explicitly mention it. So I am using this as a straw to clutch on as the rest of the session consisted of taking things apart. A lot of things!
I removed the avionics skin again to tie everything up in there and finish the installation. I also removed the seat pan so I can clean up everything in the forward tunnel as well as finalizing the installation the crotch straps, etc.. I might just leave it open until I get to the airport as it will likely have to be open for certification anyway.
Which reminds me that I really have to call my DAR and discuss the details with him ...


Monday, August 12, 2013

Right Turtle Deck Riveted

I checked the seal for the fuel nozzle flange when I got home from work. This time it was perfect.


No cavities from trapped air or any other flaw. I cleaned the skins and the seal from the wax and re-installed it.


Looked good but I was a bit concerned about the somewhat thick bead of cured ProSeal around the opening. Sure enough the fuel cap would not go all the way into its recess.


So out with it again and I trimmed off the bead with a carpet knife.
The second time it fit much better!



I cleaned up the inside and forgot to attach the wire for the fuel sender to call this section completed.



Instead I finalized the turtle deck skin on the right side now that the tank is installed.



It looks like I am running low on rivets to complete the left side. I will order some more tomorrow as the left skin will soon get finalized too.

I don't know about you but to me this cap seems to be begging for some fuel!


Sunday, August 11, 2013

Tank Installed

It was finally time to put the tank in. Before I could do that, I had to install the aft tunnel cover and the bulkhead edge cover.
As I am closing up an area that necessary to be looked at during the AW inspection, I took a good photo in the hope that this will be sufficient.



That was also the time to reinstall the ELT that had been removed for installing the landing gear reinforcement.


As the rear window will eventually be installed I tried to insert the tank as it would be when the window is in.


Please note that it is advisable to remove the ELT antenna plate before inserting the tank.


So far so good, but how to tighten the fittings for the fuel line and return line hook-ups?
I lifted the tank after lightly attaching the fittings from the belly and put a piece of 2x4 underneath to hold it there. That gave enough room to use two wrenches for the fittings. One to avoid the sealed part on the tank could move and break the seal and the other to tighten the fitting.


Now it was time to create the seal on the fuel nozzle flange to the turtle deck skin.
First I verified that it still aligned correctly.


Knowing how sticky ProSeal was, I decided to apply plenty of masking tape to avoid a mess on the skins. I used carnauba wax as a release agent, inside and out!


Then it was goo-time!


I quickly removed the masking tape.


Not so bad. I could trim the cured ProSeal back a bit but I made a mistake much earlier in the stage when painting the skins. I falsely assumed that the seal would really be larger in diameter than the flange and left a little clearance around it. I think I will let the ProSeal cover this rather than showing bare aluminum. I could always paint the ProSeal later to make it look more streamlined.

It was time to leave the setup alone so it cure correctly.

The next day showed this result:


I was not able to insert the 6th screw the day before and was just hoping it would not make a huge difference.
Thanks to the carnauba wax the screws and the Proseal stains came off easily. I separated the skin and the flange by removing the upper clecos and pulling the skin back carefully.


Looked good - at first. A closer inspection revealed that there were some air pockets in the seal that needed to get filled.


So I gave it another round and this time I could insert all 6 screws. The assembly had to stay undisturbed for another night, so I could not do much more at this time.

Either I was more aware of my surroundings today or it was just a special day but I caught all this right around the shop.




The latter is a king snake and not poisonous. It was rather scared to get so much attention when all it wanted was some fresh pack rat to swallow ...

Next steps: I think it is time to get the fuel system checked for leaks again by filling it up and pumping fuel around. Should this succeed, I am planning to pull the plane out of the car port (nose wheel still on the concrete ramp, prop over concrete), install the canopy and fire the engine up.

Wish me luck!

Sunday, July 7, 2013

Wheel Fairings Started

Early in the morning I started cleaning up some open sections. Among them was the "installation" of the steps. I still did not install the steps but I installed the hardware in the holes that will eventually hold the steps to the fuselage. That way I was able to finish the section without a bad conscience.
I also finished the canopy section by finally re-drilling the 3 front holes that were covered by the glasswork when building up the skirt.




I even finished the last piece of tedious work that was left over from removing the pedals when they were leaking brake fluid - the little brackets that connect the tunnel to the instrument shelf. I honestly hate these little brackets! It took me painful 20 minutes to just insert the two top screws and get them tightened. There is just no room to work a screw driver without slipping the tip in the head of the screw.


Finally I prevailed but I honestly hope I will never have to remove them ever again!

By then I was covered in sweat from working on these brackets and I was not sure what else made sense to work on. The antenna installations will have to wait a few days while I am waiting for the star washers to arrive and so I decided to start the messy work on the wheel fairings. Sanding fiberglass in 105 degF is no fun but there just was nothing else to do.

The first step was to reduce the overlap of fiberglass on the inside of the front piece on the top, so it would neatly and smoothly transition to the aft half.



The fiberglass is rather thick and it is hard to tell if the material was removed evenly, so I assume I will have to revisit this step when the parts have been sanded back to their scribe lines.

But before that Van's asked me to sand back the tire openings. For now I just went to the scribe line but I might open it up a little bit as it seems to be awfully close to the tire.




That was enough work in the heat and I called it quits when the afternoon storm was moving in. At least the winds swept the nasty fiberglass dust away (or spread it out evenly), so cleanup was rather quick.

Sunday, June 30, 2013

Closing Out Sections

Thanks to the timely arrival of another load of ProSeal, I was able to close out 3 open sections in the build manual that were in some way or another waiting for some sealant job to get done.
Before this weekend work started I was able to remove some more of the Blue Plague that was sticking to the tip of the right wing.


I forgot to take a picture when it was all off but it looks close to what you see above. Quite some scratching again, but nothing deep.

The last days were incredibly hot - even for Tucson. The monsoons are still not anywhere close and so it was a dry heat, and that's the only positive thing to say about it.


This was the sun setting on the last cooler days before the weekend, which is to say it only got to the lower hundreds.


Even the local animals (this one is a particularly young bunny that has not experienced another summer before) were struggling with this heat.
So I decided to get up before 5am each day to be able to get some work done outside without collapsing. Even then it was in the lower 80s.

It was time to mix the smelly ProSeal and get started on sealing the firewall - again. First a look at the beautiful sight of the installed engine.


Then I filled a syringe with ProSeal, in the hopes of making less of a mess, but as you can see, I still am not good at putting the stuff only where it is needed.




It worked much better on the side skins where I sealed the leftover rivet holes from the reinforcement angles. That is because I used blue tape with a slightly oversized hole punched into it as a template. After peeling the tape off I was left with a perfectly round seal.



I also sealed the rivet heads from riveting on the heater box. The manual did not ask for it but I do not understand why as these rivets are providing the same risk of letting gases from the engine seep into the cabin. Angles were too bad to get a shot at them though, so no photos.
This step completed section 54.

After the ProSeal task was done, I put the lower cowl on...


... (pretty, isn't it?)... and installed the SCAT hose, which completed section 49.


I also gooped up the penetration holes in the firewall that contain the cables and wires. I used red RTV for this and not the suggested firewall sealant. I was considering using the rest of the ProSeal but decided against it. If I ever need to pull a wire or want to add another one, removing the RTV would be easier than any of the other sealants. And this completed section 50.



The idea is now to leave the lower cowl on and to remove the instrument cover to finish up the pitot line plumbing. I will try to also install the Ts to plumb in the backup steam gauges at this point and then plug their ends. There is also a tad more wiring work to be done for the avionics which includes running the missing wire from the radio to the AV-50000 for the serial port.
Additional antennas for the PCAS, ADS-D and the APRS system that I will add are sitting in the shop and I think I might add those now as it will be easier to crawl into the tailcone without the tank installed.